Final | 3/11/2019 | 3/11/2019 | 3/11/2019 | A | PASS |
Eric Story
|
|
|
All corrections fixed with neutrals Final ok
|
Final | 3/7/2019 | 3/8/2019 | 3/8/2019 | A | CANC |
Eric Story
|
|
|
Marcus Phone #: ###-#### Owner needs a little more time to isolate neutrals in boxes for GFCI protection, will re-schedule for monday 3-11
|
Final | 3/8/2019 | 3/11/2019 | 3/8/2019 | A | CANC |
Eric Story
|
|
|
Marcus Phone #: ###-####
|
Electrical Rough-In | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | PASS |
Rock A. Hudson
|
|
|
Marcus Phone #: ###-#### Corrections complete. Rough in ok cover
|
Electrical Rough-In | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | FAIL |
Daryl DeGrange
|
|
|
Marcus Phone #: ###-#### NEC 300.5 Depth of trench shall 18in to top of PVC. Establish ground rod at separate structure. Man doors require luminair exterior of door
|
Conference | 2/11/2019 | 2/11/2019 | 2/11/2019 | P | DONE |
Eric Story
|
|
|
Marcus Phone #: ###-#### Discussed options for power to shop, other conferences had James talking about 100 amps fed from all-in one. Owner will take that route as it's cheaper then buying a new transformer from IDPCO....
|
Conference | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | DONE |
Eric Story
|
|
|
Marcus Phone #: ###-#### Discussed proper boxes required for box fill and service change needed for 200 amps needed at shop
|
Conference | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
James Ady
|
|
|
Marcus-please call 30 minutes prior to meet if possible Phone #: ###-####-2030 Talked about running 100a feed to shop from 200a Meter main. Direct burial at 24in. Conduit inside of metal building.
|
Application received | | | 1/22/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/22/2019 | | DONE |
|
|
|
|