Final | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Brecklee Brown Final ok
|
Electrical Rough-In | 4/11/2019 | 4/11/2019 | 4/11/2019 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Brecklee Brown Stopped by project. Spoke to contractor about scheduling and need to cooridinate with office Date of inspection. Listing inspection ok.
|
Final | 4/10/2019 | 4/12/2019 | 4/11/2019 | A | CANC |
James Ady
|
|
|
Plans have been left in the meter box Phone #: ###-#### >> Inspection requested via web by Brecklee Brown Inspection cancelled from web by: Brecklee Brown
|
Electrical Rough-In | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | FAIL |
James Ady
|
|
|
We need a 1PM inspection Phone #: ###-#### Inspection requested via web by Brecklee Brown No body onsite recall
|
Issue PAID IN FULL permit | | | 1/28/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/28/2019 | | DONE |
|
|
|
This permit was created on the web by Brecklee Brown
|