Electrical Rough-In | 8/12/2020 | 8/12/2020 | 8/12/2020 | P | PART |
Rock A. Hudson
|
|
|
Cover for 4th/5th elevator lobbies. Tyson is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Level 5 elevator lobby access located too far from damper disconnecting means, can installed in access framed. Level 4 elevator lobby rough in ok cover,
|
Electrical Rough-In | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Rock A. Hudson
|
|
|
Pool Bonding. Tyson is the contact. Phone #: ###-#### Inspection requested via web by Buster Pool perimeter, ladder, hoop, handicap chair bonds rough in ok cover.
|
Electrical Rough-In | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | PASS |
Rock A. Hudson
|
|
|
Cover on lvl 2/3 elevator lobbies and lvl 5 corridor. Phone #: ###-#### Inspection requested via web by Buster Bowen Informed of 110.26(A)(4)- Minimum access size for equipment above grid ceiling or suspended ceiling not designed for crawl space shall be 22"x22". Areas noted ceiling rough in ok cover
|
Electrical Rough-In | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PASS |
Rock A. Hudson
|
|
|
4th floor corridor cover and UG for pool. Tyson is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Level 4 corridor grid and pool wall lights underground rough in ok cover.
|
Electrical Rough-In | 7/31/2020 | 7/31/2020 | 7/31/2020 | P | PASS |
Rock A. Hudson
|
|
|
1st floor BOH ceiling cover. Tyson is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Back of house grid complete rough in ok cover
|
Electrical Rough-In | 7/28/2020 | 7/29/2020 | 7/29/2020 | A | CANC |
Rock A. Hudson
|
|
|
3rd floor IDF room rough in. Tyson is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen No inspection needed. Asked to cancel request.
|
Electrical Rough-In | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling cover for 2nd and 3rd floor corridors. Tyson is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Level1 unisex bath 141 hard lid, levels 2 and 3 corridor grid rough in ok cover.
|
Electrical Rough-In | 7/24/2020 | 7/24/2020 | 7/24/2020 | P | PASS |
Rock A. Hudson
|
|
|
UG cover for 6th street side historic lights. Phone #: ###-#### Inspection requested via web by Buster Bowen Informed all wiring on load side of electrical service for public works lighting or equipment must be inspected by a public works inspector. Contact informed of confusion on which inspector is required so has call both in for inspections. 6th street sidewalk light pole underground rough in ok cover.
|
Electrical Rough-In | 7/13/2020 | 7/13/2020 | 7/13/2020 | P | PASS |
James Ady
|
|
|
Ceiling cover 1st floor lobby. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Breakfast, lobby, lounge/ S. elevator lobbly, kitchen, Offices 120,121, 122, 131, Data room, breakroom, Soffits in 139 & 137. Ceilings only ok to cover
|
Electrical Rough-In | 7/8/2020 | 7/8/2020 | 7/8/2020 | A | PASS |
Rock A. Hudson
|
|
|
swimming pool grounding and bonding rough in. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Pool bonds, shell, 4 corners, lights, fountain heads rough in ok cover.
|
Conference | 7/7/2020 | 7/7/2020 | 7/7/2020 | A | PASS |
Rock A. Hudson
|
|
|
Swimming pool grounding and bonding. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Discussed the required pool and equipotential bonding. #8 solid from equipment to pool shell, pool shell recognized bonding jumper to 4 corners, and perimeter lights, and any additional rails, ladders, or other metallic parts associated with pool.
|
Electrical Rough-In | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | PASS |
Mark Moncarr
|
|
|
7th floor rooms and 7th floor laundry. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Ok cover ceilings and baths for rooms 714-724
|
Electrical Rough-In | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | PASS |
Rock A. Hudson
|
|
|
7th floor front street side rooms. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Units 702 thru 715 bath and HVAC wall and hardlids rough in ok cover
|
Electrical Rough-In | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Rock A. Hudson
|
|
|
6th Floor Vending area rough in cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Area noted walls and hardlid rough in ok cover.
|
Electrical Rough-In | 6/4/2020 | 6/4/2020 | 6/4/2020 | A | PASS |
Rock A. Hudson
|
|
|
5th floor vending area cover. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Room noted walls and hardlid rough in ok cover.
|
Electrical Rough-In | 6/1/2020 | 6/2/2020 | 6/2/2020 | A | PASS |
Rock A. Hudson
|
|
|
6th floor guest rooms cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen 602 thru 624 baths, HVAC, hardlids rough in ok cover
|
Electrical Rough-In | 5/19/2020 | 5/19/2020 | 5/19/2020 | P | PASS |
Rock A. Hudson
|
|
|
5th Floor guest room cover. Danny is contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Units 502 thru 524 bathroom and HVAC walls and hardlids rough in ok cover.
|
Electrical Rough-In | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Rock A. Hudson
|
|
|
Pool area ceiling cover. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Pool area ceiling rough in ok cover.
|
Electrical Rough-In | 5/5/2020 | 5/5/2020 | 5/6/2020 | P | PASS |
Rock A. Hudson
|
|
|
4th Floor rough in. Danny is contact Phone #: ###-#### Inspection requested via web by Buster Bowen Units 402 thru 424 bathrooms, and hvac, and vending walls and hardlids rough in ok cover
|
Electrical Rough-In | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | PASS |
Rock A. Hudson
|
|
|
3rd Floor secondary framing cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Level 3- 302 thru 324 bathrooms and vending wall rough in ok cover.
|
Electrical Rough-In | 4/23/2020 | 4/24/2020 | 4/24/2020 | A | PASS |
Rock A. Hudson
|
|
|
7th floor, front street corridor north wall (exterior wall) only. Danny is the contact
Phone #: ###-#### Inspection requested via web by Buster Bowen Level 7 north corridor walls and hardlid rough in ok cover.
|
Electrical Rough-In | 4/15/2020 | 4/17/2020 | 4/17/2020 | A | PASS |
Rock A. Hudson
|
|
|
Ceiling cover in mens/womens first floor. Danny is the contact but will not be onsite. Phone #: ###-#### Inspection requested via web by Buster Bowen Level 1 bathroom hardlids rough in ok cover.
|
Electrical Rough-In | 4/3/2020 | 4/10/2020 | 4/10/2020 | A | PASS |
Mark Moncarr
|
|
|
2nd floor cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Ok cover drop ceilings in 2nd floor rooms.
|
Electrical Rough-In | 4/3/2020 | 4/3/2020 | 4/3/2020 | P | CANC |
Rock A. Hudson
|
|
|
2nd Floor Cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Unable to perform inspection due to site is on a suspended job site list received 4-2-2020. General contractor to clear suspension which we will receive a confirmation notice and then have electrical contractor request inspections.
|
Electrical Rough-In | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | PASS |
Rock A. Hudson
|
|
|
Cover.... Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Level 1 kitchen walls rough in ok cover.
|
Electrical Rough-In | 3/23/2020 | 3/24/2020 | 3/24/2020 | A | PASS |
Rock A. Hudson
|
|
|
Cover inspection 6th floor. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Level 6 corridor firelids and walls rough in ok cover.
|
Electrical Rough-In | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | PASS |
Rock A. Hudson
|
|
|
7th floor guest and corridor cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Units 702 thru 724, corridors except east of door north wall rough in ok cover.
|
Electrical Rough-In | 3/11/2020 | 3/12/2020 | 3/12/2020 | A | PASS |
Rock A. Hudson
|
|
|
Corridor cover for floors 3-5. Tyson is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Areas noted rough in ok cover
|
Electrical Rough-In | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | PASS |
Rock A. Hudson
|
|
|
2nd floor corridor wall cover. Tyson is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Level 2 corridor only rough in ok cover
|
Electrical Rough-In | 2/27/2020 | 2/27/2020 | 2/27/2020 | P | PASS |
Rock A. Hudson
|
|
|
1st Floor Hotel rough in. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Discussed luminaire and receptacle clearances from pool water edges as per article 680.22. Level 1 hotel walls except kitchen area rough in ok cover
|
Electrical Rough-In | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Rock A. Hudson
|
|
|
6th Floor rooms wall cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Units 602 thru 624 walls rough in ok cover.
|
Electrical Rough-In | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Rock A. Hudson
|
|
|
Soffit Cover. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Exterior soffits level 1 rough in ok cover
|
Electrical Rough-In | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Rock A. Hudson
|
|
|
7th Floor stair tower cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Stair tower noted wall pour rough in ok cover.
|
Electrical Rough-In | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
Rock A. Hudson
|
|
|
Fifth floor wall and ceiling cover hotel. Contact is Danny Phone #: ###-#### Inspection requested via web by Buster Bowen Level 5 units 502 thru 524 walls and fire lids, West corridor walls and fire lids, south corridor fire lid only rough in ok cover.
|
Electrical Rough-In | 1/1/2020 | 1/2/2020 | 1/2/2020 | A | PASS |
Rock A. Hudson
|
|
|
Cover for the 4th floor and 6th floor shear wall. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Level 4 units 402 thru 424 walls and fire lids, west corridor walls and fire lids, south corridor fire lid rough in ok cover
|
Electrical Rough-In | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | PASS |
James Ady
|
|
|
Hotel Stair Tower. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen 5th floor stairwell light. (Forms were installed prior to inspection. Informered contractor of BCC. Unlawful to cover prior to inspection.)
|
Electrical Rough-In | 11/22/2019 | 11/22/2019 | 11/22/2019 | A | PASS |
Rock A. Hudson
|
|
|
2nd floor common area cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Level 2 corridor walls and fire lid rough in ok cover.
|
Electrical Rough-In | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Rock A. Hudson
|
|
|
Hotel Stair tower. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Level 4 hotel stair pour rough in ok cover
|
Electrical Rough-In | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Rock A. Hudson
|
|
|
2nd floor mock up room ceiling cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Unit 223 mockup rm entry and bath ceiling rough in ok cover
|
Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Rock A. Hudson
|
|
|
3rd Floor hotel room cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Level 3 rooms 302 thru 324 rough in ok cover
|
Electrical Rough-In | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | PASS |
Rock A. Hudson
|
|
|
2nd Floor cover. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Level 2 units 202 thru 224, corridor all of ceiling and west walls rough in ok cover
|
Electrical Rough-In | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | NR |
Rock A. Hudson
|
|
|
2nd floor wall cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Prewalk south and west room. Nail plate all holes used to run MC cable that do not maintain 1 1/4" from framing surfaces. Secure MC above areas that will be sheet rocked, corners and some hanging below ceilings. ENT runs shall not have more than 360 degrees of bends. Will recall when ready.
|
Electrical Rough-In | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Rock A. Hudson
|
|
|
Cover for hotel stairway shear wall. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Discussed type of interior raceway for parking garage. With in 10' of exterior edge of garage shall be concidered wet location. All interior areas inside this 10' measurement shall be a dry location as per previous jobs thru-out city. Level 3 hotel stair wall south east corner rough in ok cover.
|
Electrical Rough-In | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PART |
Rock A. Hudson
|
|
|
2nd floor rooms wall cover. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Discussed if AFCI protection required. 210.12(C)- All 120 volt, single phase, 15 and 20 amp branch circuits suppying outlets and devices installed in guest rooms and guest suites of hotels and motels shall have AFCI protection described in 210.12(A)(1) thru (6). Discussed if 1 siding with drywall is allowed. As per Boise City ordinance 4-05-23 UNLAWFUL TO CONCEAL It shall be unlawful for any person, to cover up or in any way conceal any electrical wiring, cables, conduits or other equipment until the same has been inspected and approved by an Electrical Inspector. Room 223 Mock up- Rough in ok cover
|
Electrical Rough-In | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Rock A. Hudson
|
|
|
Podium deck hotel side. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Area noted over pool. pour noted rough in ok cover.
|
Electrical Rough-In | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | PASS |
Rock A. Hudson
|
|
|
Concrete cover on PT deck. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Level 2 PT deck pour rough in ok cover
|
Electrical Rough-In | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Mark Moncarr
|
|
|
Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Ok cover grd work by SE stairwell near pool area.
|
Electrical Rough-In | 5/23/2019 | 5/28/2019 | 5/28/2019 | A | PASS |
Rock A. Hudson
|
|
|
UG cover. Danny is the contact. Thanks Phone #: ###-#### Inspection requested via web by Buster Bowen Underslab western 1/3rd as noted on contractor print rough in ok cover.
|
Issue PAID IN FULL permit | | | 2/18/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 2/18/2019 | | DONE |
|
|
|
This permit was created on the web by Sean DeLacy
|
Electrical Rough-In | 8/13/2020 | 8/18/2020 | | P | |
Rock A. Hudson
|
|
|
6th/7th floor elevator lobbies and 7th floor corridors. Tyson is the contact. Phone #: ###-#### >> Inspection requested via web by Buster Bowen
|
Electrical Rough-In | 8/13/2020 | 8/14/2020 | | A | |
Rock A. Hudson
|
|
|
6th floor corridor ceiling covers. Tyson is the contact. Phone #: ###-#### >> Inspection requested via web by Buster Bowen
|