Final | 5/30/2019 | 5/30/2019 | 5/30/2019 | P | PASS |
Eric Story
|
|
|
access 1027 Phone #: ###-#### Inspection requested via web by David Nelson Occ card signed final ok
|
Final | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | FAIL |
James Ady
|
|
|
access: 1027 **lockbox on the bike rack outside** Phone #: ###-#### Inspection requested via web by David Nelson 406.12 5 Buisness offices, waiting rooms and corridors shall be tamper resistant. 210.8. Recep next to wash basin in Janitors closet.
|
Electrical Rough-In | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Eric Story
|
|
|
Ceiling Suspended ceiling onlt ok to cover
|
Electrical Rough-In | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | FAIL |
Eric Story
|
|
|
Above GRID inspection Phone #: ###-#### Inspection requested via web by David Nelson Open J-Boxes throughout entire job, Will reschedule for afternoon
|
Electrical Rough-In | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | CANC |
Eric Story
|
|
|
Above GRID inspection Phone #: ###-#### Inspection requested via web by David Nelson
|
Electrical Rough-In | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PASS |
Eric Story
|
|
|
code box on bike rack is 1027, keys for 103 or north doors Phone #: ###-#### Inspection requested via web by David Nelson Walls only ok to cover Will need to verify on ceilng inspection Panel A in mechanical room conduit has no more 360 degrees in bend, as of now it has more then allowed and needs a puls box....
|
Electrical Rough-In | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | PASS |
Tom Saunders
|
|
|
access 1027 lock on bikerack floor outlets in slab, conduit inspection Phone #: ###-#### Inspection requested via web by David Nelson... underground approved for cover
|
Issue PAID IN FULL permit | | | 3/15/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 3/15/2019 | | |
|
|
|
|
Application received | | | 3/15/2019 | | DONE |
|
|
|
This permit was created on the web by David Nelson
|
First Notice | 5/30/2019 | 5/30/2019 | | | |
Eric Story
|
|
|
|