Final | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Mark Moncarr
|
|
|
Any time after 9:00 am Phone #: ###-#### Inspection requested via web by Michael Barrie Ok final.
|
Final | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | FAIL |
Mark Moncarr
|
|
|
Ready for final inspection. Phone #: ###-#### Inspection requested via web by Michael Barrie 1. Lockout for hood. 2. Service recept for mini split system. 4. Weather proof covers for out switch and recepts. 5. Tamper resistant throughout. 6. Down size breaker for mini split. Needs to be 15a to match wire size from disconnect. 7. Weather proof cover for soffitt recept out back
|
Permanent Service | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PASS |
Mark Moncarr
|
|
|
New 200 amp service installed on residence and connected to new 100 amp service in ADU. Ready to power up both panels and backfill trench. Request inspection as early as possible in order to have Idao Power restore service to both residences. Phone #: ###-#### Inspection requested via web by Michael Barrie p/s o/h n ok
|
Electrical Rough-In | 4/3/2019 | 4/4/2019 | 4/4/2019 | P | PART |
Mark Moncarr
|
|
|
Rough-in inspection (upstairs only) for ADU anytime after 11:00 a.m. Phone #: ###-#### Inspection requested via web by Michael Barrie Upstairs only ok for cover. Small kitch, closet and no dedicated bedroom space. All open floor.
|
Final | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | CANC |
Mark Moncarr
|
|
|
Request about a 20 minute consultation on-site (2816 W Breneman) to discuss electrical needs for ADU any time after 2:00 p.m. Phone #: ###-#### Inspection requested via web by Michael Barrie I changed to a conference.
|
Conference | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | DONE |
Mark Moncarr
|
|
|
Discussed outlet layout and dedicated circuits.
|
Issue PAID IN FULL permit | | | 3/29/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/29/2019 | | DONE |
|
|
|
This permit was created on the web by Michael Barrie
|