Final | 6/28/2019 | 6/28/2019 | 6/28/2019 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Hilke Ok final. Island recept was installed under a roughly 15in overhang. Contractor blanked off and I had him move it to a code compliant location.
|
Final | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | NR |
Mark Moncarr
|
|
|
When you have an idea what time you can get there call to let me know so I can make sure I or someone else is there to let you in. Thanks a bunch. -Wyatt Dryden Phone #: ###-#### Inspection requested via web by Dan Hilke
|
Electrical Rough-In | 5/1/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Mark Moncarr
|
|
|
House is unoccupied, someone should be there but if not then I can tell you how to get in if you just call or text. Phone #: ###-#### Inspection requested via web by Dan Hilke Ok cover whole house. Notified electrician to tell General for future, not to foam or caulk boxes or it will be removed before electrical inspection.
|
Rough-In Permanent Service | 3/31/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Mark Moncarr
|
|
|
The meter and service panel are being moved because the existing mast location is within the new addition on the back of the house, and must be moved to the outside of the new addition in order to get trusses up. The intention is get power reconnected by the end of the day, but we won''t be ready for an inspection until near the end of the day. If you call/text after noon I should be able to provide an estimated time we''ll be ready for the inspection. Phone #: ###-#### Inspection requested via web by Dan Hilke p/s o/h n ok
|
Issue PAID IN FULL permit | | | 3/31/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/31/2019 | | DONE |
|
|
|
This permit was created on the web by Dan Hilke
|