Final | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | PASS |
Mark Moncarr
|
|
|
Job was called in as a RI, was supposed to be a final.
|
Electrical Rough-In | 5/3/2019 | 5/10/2019 | 5/10/2019 | A | PASS |
Mark Moncarr
|
|
|
Plans left on site in meter box Phone #: ###-#### Inspection requested via web by Brecklee Brown Ok final. Line side, 60a fuses. 225a buss rating.
|
Conference | 5/3/2019 | 5/8/2019 | 5/8/2019 | P | CANC |
James Ady
|
|
|
We are doing a meter upgrade and need a power to panel in order to get the power restored. We would like to schedule this around 1PM Phone #: ###-#### Inspection requested via web by Brecklee Brown
|
Electrical Rough-In | 5/3/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
James Ady
|
|
|
We also have a power to panel inspection today for the meter upgrade in order to get power restored. May want to do rough at the same time. Phone #: ###-#### Inspection requested via web by Brecklee Brown listing only ok
|
Permanent Service | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
James Ady
|
|
|
We are doing a meter upgrade and need a power to panel in order to get the power restored. We would like to schedule this around 1PM Phone #: ###-#### Inspection requested via web by Brecklee Brown p/s u/g rec ok
|
Issue PAID IN FULL permit | | | 4/9/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/9/2019 | | DONE |
|
|
|
This permit was created on the web by Brecklee Brown
|