First Notice | 5/17/2019 | 5/17/2019 | 9/29/2019 | | DONE |
James Ady
|
|
|
This permit finaled on the web by Jonathan Poot
|
Final | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
James Ady
|
|
|
Lock box code for access to the building is: 9781 Project plans are in the breakroom in the back of the suite, either on the counter top or in one of thr drawers. Phone #: ###-#### Inspection requested via web by Jonathan Poot Final ok
|
Final | 5/15/2019 | 5/15/2019 | 5/15/2019 | P | FAIL |
Rock A. Hudson
|
|
|
The lock box code to get inside is 9781 Phone #: ###-#### Inspection requested via web by Jonathan Poot Unable to locate plans on site. provide and recall
|
Electrical Rough-In | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Eric Story
|
|
|
LOCK BOX IS FACING MILWAUKEE ST. LOCK BOX # IS: 9781 FROM TOP TO BOTTOM. Phone #: ###-#### Inspection requested via web by Jonathan Poot Dividing wall only ok to cover
|
Issue PAID IN FULL permit | | | 4/23/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/23/2019 | | DONE |
|
|
|
This permit was created on the web by Jonathan Poot
|