Final | 5/21/2019 | 5/21/2019 | 5/21/2019 | A | PASS |
Mark Moncarr
|
|
|
Ok final. For future inspections, a RI inspection is required by Boise City Ordinance prior to installation. Any installations done from here forward will have a RI inspection first. If RI inspection isnt completed, a re-inspect fee will apply a long with removal of equiptment as needed to verify listings.
|
Electrical Rough-In | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | PASS |
Mark Moncarr
|
|
|
If possible, please call the number above prior heading out to the jobsite. Thank you! Phone #: ###-#### Inspection requested via web by BRS Permitting UL listing verified.
|
Issue PAID IN FULL permit | | | 5/2/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/2/2019 | | DONE |
|
|
|
This permit was created on the web by BRS Permitting
|