Final | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Mark Moncarr
|
|
|
If house is locked the key to the side door is just inside the gate to the left. It is under a water bottle and can unlock the side door. General contractor is supposed to be there around 8-8:30. Please call if necessary. Phone #: ###-#### Inspection requested via web by Monty Adkinson Ok final.
|
Electrical Rough-In | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Monty Adkinson Ok cover main level and basement.
|
Permanent Service | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Mark Moncarr
|
|
|
Need new service okay to energize so existing service can be demoed and removed. Should be done by 12:30 pm with new service. Phone #: ###-#### Inspection requested via web by Monty Adkinson New service location on NE corner. Overhead mast is stabilized. Existing overhead drop needs to be moved in order to due addition. p/s o/h n ok
|
Issue PAID IN FULL permit | | | 5/9/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/9/2019 | | DONE |
|
|
|
This permit was created on the web by Monty Adkinson
|