Final | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Tom Saunders
|
|
|
please call David prior he is in Meridian and will need a little time to drive over Phone #: ###-#### Inspection requested via web by Ashley Rasmussen....
informed installer future installs shall have rough inspections or a reinspection fee will be applied Labelling, disconnect, and OCPD ok
|
Electrical Rough-In | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Tom Saunders
|
|
|
please call David prior he is in Meridian and will need a little time to drive over Phone #: ###-#### Inspection requested via web by Ashley Rasmussen.... UL listed equipment verified
|
Final | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | CANC |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Ashley Rasmussen.... 1) Rough-in inspection required by City of Boise installer of solar is required to be there materials on roof shall be removed to ground level for inspection
|
Issue PAID IN FULL permit | | | 5/10/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/10/2019 | | DONE |
|
|
|
This permit was created on the web by Ashley Rasmussen
|