Final | 4/18/2020 | 4/20/2020 | 4/20/2020 | A | PASS |
James Ady
|
|
|
Pool final owner will be home in th A.M Pool final ok
|
Final | 10/14/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
James Ady
|
|
|
Final electrical on swimming pool *** The owner can not be home until 1:30 pm *** The home owner''s name is Brooke - if no answer at the door, please call her at ###-####. Phone #: ###-#### Inspection requested via web by Kevin Koomler The pool has been winterized. I am unable to give final at this time. Recall when pool can be tested
|
Final | 10/8/2019 | 10/9/2019 | 10/9/2019 | P | NH |
James Ady
|
|
|
Final electrical on swimming pool Owner will be home, Brooke -###-#### Phone #: ###-#### Inspection requested via web by Kevin Koomler nobody home
|
Electrical Rough-In | 5/31/2019 | 6/3/2019 | 6/3/2019 | A | PASS |
James Ady
|
|
|
Equipotential The gate will be open on the south side. Phone #: ###-#### Inspection requested via web by Kevin Koomler EQ bond only ok to cover
|
Electrical Rough-In | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Rock A. Hudson
|
|
|
fiberglass pool bonding and u.g. lights Phone #: ###-#### Inspection requested via web by Kevin Koomler #8 run from equipment to edge of pool and underground rough in ok cover
|
Issue PAID IN FULL permit | | | 5/13/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/13/2019 | | DONE |
|
|
|
This permit was created on the web by Kevin Koomler
|