Final | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PASS |
Mark Moncarr
|
|
|
Please call 30 minutes prior to arrival Phone #: ###-#### Inspection requested via web by Kenneth Lamm Ok final. 1 piece vanity in place and screwed and caulked to wall. Homeowner had blanked box below vanity. Existing #14 wire went from existing bed outlet to 3 gang for bathroom. Had homeowner cut #14 at entry of 3 gang box with 20a circuit so as it cannot ever be energized
|
Electrical Rough-In | 10/13/2019 | 10/17/2019 | 10/17/2019 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kenneth Lamm...no conference scheduled...work complete...using existing circuit for bath lighting and using existing jaquzzi tub circuit to become new bath outlet circuit...outlet in cabinet-verify GFCI protected at final
|
Issue PAID IN FULL permit | | | 5/15/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/15/2019 | | DONE |
|
|
|
This permit was created on the web by Kenneth Lamm
|