Final | 1/8/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Mark Moncarr
|
|
|
Please send me a text with ETA. Thank you! Marisa Phone #: ###-#### Inspection requested via web by Marisa Weppner Ok final. Corrections made.
|
Final | 10/9/2019 | 10/11/2019 | 10/11/2019 | A | FAIL |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Marisa Weppner 1. 2 GFI's need changed to tamper resistantt 2. Top right brkr for loft is tripping. 3. Protect 12ga wire in bathroom area 4. Change single pole toggle at front door so switch sits flush with face plate. 5. Bath recept needs to be on 20a circuit. Change out light wire to 12ga, and place on 20a breaker. 6.
|
Final | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | CANC |
Mark Moncarr
|
|
|
Havent heard from IDP for energize service. Once IDP energizes service, please schedule a final.
|
Final | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | CANC |
Mark Moncarr
|
|
|
Marissa Phone #: ###-#### Resheduled for 9/5/19. Have not heard back from IDP for energize service.
|
Permanent Service | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
Mark Moncarr
|
|
|
Marissa ###-#### p/s o/h n ok
|
Conference | 7/1/2019 | 7/3/2019 | 7/3/2019 | A | DONE |
Mark Moncarr
|
|
|
William Phone #: ###-#### Discussed pulling GEC out of meter and re-routing to panel. A few locations where wires stapled above boxes need to be moved more to center of stud. Wires need to be 1-1/4 away from face of stud. A few locations where 14/2 is used along with 12/2 need to be breakered at a maximum of 15a.
|
Rough-In Permanent Service | 7/1/2019 | 7/3/2019 | 7/3/2019 | A | CANC |
Mark Moncarr
|
|
|
I would like the inspection as early as possible on the 3rd. I have a flight from Boise at 12:30 pm. Thank you very much Phone #: ###-#### Inspection requested via web by Marisa Weppner
|
Issue PAID IN FULL permit | | | 5/24/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/24/2019 | | DONE |
|
|
|
This permit was created on the web by Marisa Weppner
|