Final | 6/13/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Mark Moncarr
|
|
|
Jenn Phone #: ###-#### Ok final. Silfab SLA 300 model panels were listed on paperwork. SBA model panels were used. Verified that the SBA is the newer version. Both models weigh the same, also the SBA model is a 290 watt panel. Wattage is below what original plans were speced for.
|
Electrical Rough-In | 6/13/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Mark Moncarr
|
|
|
Jenn Phone #: ###-#### Verified UL listing on components.
|
Fees Due Hold | 6/11/2019 | | 6/13/2019 | | DONE |
Gemma Flores
|
|
|
|
Final | 6/7/2019 | 6/10/2019 | 6/10/2019 | A | FAIL |
Rock A. Hudson
|
|
|
We have left plans on site in the meter box Phone #: ###-#### Inspection requested via web by Brecklee Brown Rough in inspection required to verify listing of all equipment. Must remove panel and other roof equipment to check listings.
|
Reinspection Fee (no hold) | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Rock A. Hudson
|
|
|
We have left plans on site in the meter box Phone #: ###-#### Inspection requested via web by Brecklee Brown Informed several times of requirement of rough in inspection for solar equipment listings.
|
Issue PAID IN FULL permit | | | 5/29/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/28/2019 | | DONE |
|
|
|
This permit was created on the web by Brecklee Brown
|