Final | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Mark Moncarr
|
|
|
please call 30 min prior inspection to thank you Phone #: ###-#### Inspection requested via web by Taras Shulga Ok final
|
Electrical Rough-In | 7/17/2019 | 7/17/2019 | 7/17/2019 | A | PASS |
James Ady
|
|
|
please call the GF onsite. number is ###-#### with any questions. this inspection is for heat floor wires. i checked ohms after installing wires, it matched the label. Phone #: ###-#### Inspection requested via web by Taras Shulga Floor heat only ok to cover
|
Rough-In Permanent Service | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Mark Moncarr
|
|
|
this is a basement remodel. needs wall cover. need also a upgraded service inspection. the house is occupied, to inspect panel, you can disconnect the existing service 100 amp breaker. the general will be onsite. Phone #: ###-#### Inspection requested via web by Taras Shulga Ok cover basement. p/s u/g n ok
|
Issue PAID IN FULL permit | | | 6/20/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/20/2019 | | DONE |
|
|
|
This permit was created on the web by Taras Shulga
|