Final | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
James Ady
|
|
|
Final inspection Final ok
|
Rough-In Permanent Service | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Corrections made rough in ok p/s u/g n ok
|
Rough-In Permanent Service | 7/10/2019 | 7/10/2019 | 7/10/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson 110.3- Expansion joint shall be installed as per manufacturers instructions. At time of installation joint shall be expanded to mid point to allow for expansion and contraction. 110.14- Connection to concrete encased electrode shall be tight. Loose turned with fingers. 210.52- Wall spaces 24" and wider shall have receptacle outlets installed. Up bed switch wall. 250.148- All metal boxes shall be connected to equipment grounding conductors. All equipment grounding conductors in a box shall be connected together. Complete make up. 250.68(A)- Access shall be provided to connection to concrete encased electrode. Mud ring 8" above.
|
Issue PAID IN FULL permit | | | 6/23/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/23/2019 | | DONE |
|
|
|
This permit was created on the web by Therrin Robertson
|