Final | 1/29/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Rock A. Hudson
|
|
|
Electrical Final. Jake is the contact Phone #: ###-#### Inspection requested via web by Deb Morton Final ok
|
Permanent Service | 12/11/2019 | 12/12/2019 | 12/12/2019 | A | PASS |
Rock A. Hudson
|
|
|
Jake is the contact. Phone #: ###-#### Inspection requested via web by Deb Morton Grounding electrodes in place at time of inspection are building steel and 2 ground rods. 250.50- All grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at building or structure served shall be bonded together to form the grounding electrode system. 250.52(A)(1)- A underground metal water pipe in contact with the earth 10' of more and electrically continuous. 250.68(C)(1)- Connection of a grounding electrode conductor to an interior metal water piping shall be with in 5' of point of entrance. p/s u/g n ok
|
Rough-In Permanent Service | 11/21/2019 | 11/27/2019 | 11/27/2019 | P | NR |
Rock A. Hudson
|
|
|
This is for a Service/rough-in - please contact Jake with any questions at ###-#### Phone #: ###-#### Inspection requested via web by Deb Morton Due to delays unable to complete work. See rough in and conference.
|
Conference | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Rock A. Hudson
|
|
|
This is for a Service/rough-in - please contact Jake with any questions at ###-#### Phone #: ###-#### Inspection requested via web by Deb Morton Discussed requirement for service. 230.6- Service entrance conductors shall be considered outside of building. 230.70(A)(1)- Service disconnecting means shall be located outside of building or immediately upon enterance of the service entrance conductors. 250.50- All grounding electodes present at each building or structure shall be bonded together to form the grounding electrode system. Informed foreman as long as minimum grounding electrodes needed we would grant permenant service however all present will be needed for final. An exterior or interior immediately on inside service disconnecting means was not on one line drawing of print created questions.
|
Electrical Rough-In | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Rock A. Hudson
|
|
|
This is for a Service/rough-in - please contact Jake with any questions at ###-#### Phone #: ###-#### Inspection requested via web by Deb Morton Foyer and electrical room walls and hardlids rough in ok cover.
|
Electrical Rough-In | 10/8/2019 | 10/8/2019 | 10/8/2019 | A | PASS |
Rock A. Hudson
|
|
|
wall rough in. Jake is the contact Phone #: ###-#### Inspection requested via web by Deb Ipsen BCC-05-23- It shall be unlawful to cover in any way any electrical wiring or equipment without same first being inspected by electrical inspector prior. Small area area for an office and bathrooms one sided and lid covered. This is the only area this will be allowed to remain. Future cover in any way in future will have to be removed completely. Southern central area bathrooms and office walls and ceiling rough in ok cover
|
Issue PAID IN FULL permit | | | 7/9/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/9/2019 | | DONE |
|
|
|
This permit was created on the web by Deb Ipsen
|
First Notice | 2/3/2020 | 2/3/2020 | | | |
Rock A. Hudson
|
|
|
|