Final | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
James Ady
|
|
|
Tom Phone #: ###-#### final ok
|
Conference | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
James Ady
|
|
|
Discuss spereration of grounds and nuetrals. Owner was unclear on how to seperate wires. Met and discribed what was needed onsite.
|
Permanent Service | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | PASS |
James Ady
|
|
|
Thomas Phone #: ###-#### p/s o/h n ok
|
Final | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | CANC |
James Ady
|
|
|
Thomas Phone #: ###-####
|
Electrical Rough-In | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | CANC |
James Ady
|
|
|
Tom-would like as late as possible if possible Phone #: ###-####
|
Electrical Rough-In | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
James Ady
|
|
|
Tom-underground/conduit-would like as late as possible if possible Phone #: ###-#### Undergrund ok to cover
|
Conference | 8/1/2019 | 8/1/2019 | 8/1/2019 | P | PASS |
James Ady
|
|
|
Tom Phone #: ###-#### Owner is doing 200A overhead service on garage and sub feeding house. Adding car charger in garage. Talked about coduit burial depth. Grounding, Seperation of Grnds/Nuet in house panel. owner has handout.
|
Application received | | | 8/1/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/1/2019 | | DONE |
|
|
|
|