Electrical Rough-In | 8/16/2019 | 8/19/2019 | 8/19/2019 | A | PASS |
Eric Story
|
|
|
To inspect where soffits were demoed and wires had to be rerouted through framing. There is some more electrical work to do but the rest will be fished through walls. Phone #: ###-#### Inspection requested via web by Dan Hilke Wires re-routed in kitchen for lighting, will need to verify a can will be installed above sink wires looped in ceiling. Ok to cover
|
Issue PAID IN FULL permit | | | 8/16/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/16/2019 | | DONE |
|
|
|
This permit was created on the web by Dan Hilke
|