Final | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | PASS |
James Ady
|
|
|
Bulk N2O system building. Phone #: ###-#### Inspection requested via web by Steve Moss Final ok
|
Electrical Rough-In | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
James Ady
|
|
|
Inspect under ground conduits before backfill. Phone #: ###-#### Inspection requested via web by Steve Moss underground from pad to building only ok to cover
|
Fees Due Hold | 9/27/2019 | | 10/7/2019 | | DONE |
Brittany Hill
|
|
|
|
Electrical Rough-In | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | PASS |
James Ady
|
|
|
Early AM if possible so trench can be backfilled for material delivery. Underground grounding ring needs inspected before backfill. Phone #: ###-#### Inspection requested via web by Steve Moss Grounding ring only ok to cover
|
Application received | | | 8/27/2019 | | DONE |
|
|
|
This permit was created on the web by Steve Moss
|
First Notice | 1/7/2020 | 1/7/2020 | | | |
James Ady
|
|
|
|