Final | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Seth Stears... labelling, disconnect, and OCPD ok
|
Electrical Rough-In | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Tom Saunders
|
|
|
McGuire Phone #: ###-####704... UL lised equipment verified voltage/amperage rating label needed for final breaker installed in panel...no access required for final
|
Override - Parcel Holds | 9/25/2019 | 1/1/1900 | 9/25/2019 | | |
|
|
|
this is not Porticade Construction so ok to call in inspection
|
Telephone call | | | 9/25/2019 | | DONE |
|
|
|
called Seth-had to leave a message on his phone-also emailed him that the fees changed on his permit. looks like he added a new branch circuit as well as 14 solar panels. As per Next Energy -Portacade Construction is no longer on this project.
as per Ele Auth-talk to Angie with Ele Auth-she will pay the 110.00 and requet a refund for the 69.00. She said they did the work not Porticade Construction.
|
Final | 9/24/2019 | 9/24/2019 | 9/24/2019 | P | NR |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Seth Stears Solar contractor is no longer involved. Need to pull building permit and adjust ELE to reflect complete solar install.
|
Electrical Rough-In | 9/10/2019 | 9/11/2019 | 9/10/2019 | A | CANC |
Tom Saunders
|
|
|
Phone #: ###-#### >> Inspection requested via web by Seth Stears Inspection cancelled from web by: Seth Stears
|
Issue PAID IN FULL permit | | | 9/9/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/9/2019 | | DONE |
|
|
|
This permit was created on the web by Seth Stears
|