Final | 8/4/2020 | 8/6/2020 | 8/6/2020 | P | PASS |
Rock A. Hudson
|
|
|
Power could not be brought to the sign location. Sign was installed with the electrical capped inside the sign. Phone #: ###-#### Inspection requested via web by Danny Pardee Final ok
|
Electrical Rough-In | 8/6/2020 | 8/6/2020 | 8/6/2020 | P | PASS |
Rock A. Hudson
|
|
|
Power could not be brought to the sign location. Sign was installed with the electrical capped inside the sign. Phone #: ###-#### Inspection requested via web by Danny Pardee Listing and disconnect confirmed if energized in future. Rough in ok
|
Issue PAID IN FULL permit | | | 9/23/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 18 2019 11:05AM
|
First Notice | 8/6/2020 | 8/6/2020 | | | |
Rock A. Hudson
|
|
|
|