Electrical Rough-In | 11/6/2019 | 11/13/2019 | 11/13/2019 | A | PASS |
Mark Moncarr
|
|
|
Shane Phone #: ###-#### Ok cover ceiling.
|
Electrical Rough-In | 10/9/2019 | 10/9/2019 | 10/9/2019 | P | PASS |
Rock A. Hudson
|
|
|
Shane Phone #: ###-#### Called Gemma and had ELE attached to BLD19-03611. Discussed if existing service can remain as is during remodel. Electrical engineer spec'ed out a service change for building. I am required to enforce electrical engineer drawings as approved by plan review. The print will required to be changed by electrical engineer documenting service is ok to remain as originally installed. As per Daryl DeGrange as noted above if engineer approves service ok to remain as is. Floor boxes and conduits rough in ok cover
|
Issue PAID IN FULL permit | | | 9/26/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/23/2019 | | DONE |
|
|
|
This permit was created on the web by Phil Capell
|