Final | 3/2/2020 | 3/2/2020 | 3/2/2020 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan pool and spa final ok
|
Electrical Rough-In | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | PASS |
James Ady
|
|
|
Bonding/Rough-In Inspection Phone #: ###-#### Inspection requested via web by Steven Ragan eq bond ok to cover
|
Electrical Rough-In | 10/7/2019 | 10/8/2019 | 10/8/2019 | A | PASS |
Rock A. Hudson
|
|
|
Rough/Cover Phone #: ###-#### Inspection requested via web by Steven Ragan Will require concrete of equivalent on east side of hot tub due to shallow depth of conduit. Under ground and bonding conductor from pool to equipment rough in ok cover
|
Electrical Rough-In | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Daryl DeGrange
|
|
|
Bonding Inspection Phone #: ###-#### Inspection requested via web by Steven Ragan Corner bonding rough-in ok to gunite pool
|
Issue PAID IN FULL permit | | | 10/2/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/2/2019 | | DONE |
|
|
|
This permit was created on the web by Steven Ragan
|