Permanent Service | 10/28/2019 | 10/28/2019 | 10/28/2019 | A | PASS |
Mark Moncarr
|
|
|
1 grd rod added, bonding verified and other corrections made. ps o/h rec ok
|
Change Status to I | | | 10/28/2019 | | DONE |
|
|
|
should not have been finaled.
|
Permanent Service | 10/18/2019 | 10/21/2019 | 10/21/2019 | A | FAIL |
Mark Moncarr
|
|
|
Keeley Phone #: ###-#### 1. Grounding electrode system needs updated. Minimum #6 copper, and 2 ground rods atleast 6' apart. 2. Left phase conductor in outside disconnect needs checked. Looks like insulation is split before landing in breaker. 3. Bushing needed in top right portion of inside panel.
|
Application received | | | 10/18/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/18/2019 | | DONE |
|
|
|
|