First Notice | 1/10/2020 | 1/10/2020 | 4/1/2020 | | DONE |
Rock A. Hudson
|
|
|
This permit finaled on the web by Brad Hoots
|
Final | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Hoots Final ok
|
Electrical Rough-In | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | PASS |
Rock A. Hudson
|
|
|
Above Ceiling inspection. If possible call 30 minuets before so Dan can meet you. Thanks Phone #: ###-#### Inspection requested via web by Brad Hoots Level 2 corridor grid rough in ok cover
|
Electrical Rough-In | 11/26/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Rock A. Hudson
|
|
|
Wall and ceiling rough-in. New 2nd floor corridor behind the lobby elevators. Phone #: ###-#### Inspection requested via web by Brad Hoots Level 2 corridor walls only rough in ok cover.
|
Issue PAID IN FULL permit | | | 11/26/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/26/2019 | | DONE |
|
|
|
This permit was created on the web by Brad Hoots
|