Final | 6/17/2020 | 6/17/2020 | 6/17/2020 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt Contractor gave permision to enter. Unoccupied space but furniture being storred. Final ok
|
Final | 6/16/2020 | 6/16/2020 | 6/16/2020 | P | CANC |
James Ady
|
|
|
Please call ahead 30 mins so builder can meet you Phone #: ###-#### Inspection requested via web by John VanZandt
|
Permanent Service | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt Needed rough in of the grounding electrode system for a detached garage.
|
Electrical Rough-In | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | PART |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt 250.32- A grounding electrode system shall be installed for panel in garage. At time of rough in #6 solid stubs out bottom of panel but does not terminate anywhere. Grounding electrode and grounding electrode conductor shall be inspected prior to cover garage. Basement rough in ok cover
|
Issue PAID IN FULL permit | | | 12/2/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/2/2019 | | DONE |
|
|
|
This permit was created on the web by John VanZandt
|