Electrical Rough-In | 5/20/2020 | 5/20/2020 | 5/20/2020 | P | PASS |
Mark Moncarr
|
|
|
Floor heat in 2 master baths Phone #: ###-#### Inspection requested via web by Bonnie Page Ok cover floor heat both mstr beds.
|
Permanent Service | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Bonnie Page p/s u/g n ok
|
Electrical Rough-In | 1/28/2020 | 1/29/2020 | 1/29/2020 | A | PASS |
Mark Moncarr
|
|
|
Look at flat roof discussed on previous consultation Phone #: ###-#### Inspection requested via web by Bonnie Page Ok cover house and rooftop. Rooftop has #12 UF runs for heaters in ceiling of patio. 16ga metal strips about 4-5 inches wide were installed over top of channels where wires are run. There will be about 3-4 inches of decking over the top of the wires.
|
Electrical Rough-In | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | CANC |
Mark Moncarr
|
|
|
Look at flat roof discussed on previous consultation. Phone #: ###-#### >> Inspection requested via web by mike brown Inspection cancelled from web by: Bonnie Page
|
Conference | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | DONE |
Mark Moncarr
|
|
|
Meet to look at pergola lights. Thanks Phone #: ###-#### Inspection requested via web by Eric Brown Discussed running power for heaters in pergola.
|
Conference | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | CANC |
Mark Moncarr
|
|
|
Meet to look at pergola lights Phone #: ###-#### >> Inspection requested via web by mike brown Inspection cancelled from web by: Eric Brown
|
Issue PAID IN FULL permit | | | 12/17/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/17/2019 | | DONE |
|
|
|
This permit was created on the web by Bonnie Page
|