Final | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | PASS |
Mark Moncarr
|
|
|
Please call the homeowner Dennis at ###-#### 20 minutes before arrival so he can meet you there. Thank you Phone #: ###-#### Inspection requested via web by Steve Blackmer Ok final.
|
Final | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | NH |
Eric Story
|
|
|
hot tub is full of water and ready for use. Thank You- Steve Phone #: ###-#### Inspection requested via web by Steve Blackmer Nobody at home
|
Permanent Service | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
Mark Moncarr
|
|
|
IPCO and RME will be onsite 9-10AM. New UG lateral conduit was inspected by IPCO. RME installed sch80 and expansion into meter base. IPCO will disconnect and RME will remove mast and Service conductors and install OEM blank over hub. IPCO will pull new feeder and terminate Phone #: ###-#### Inspection requested via web by Steve Blackmer Changed overhead drop to underground. p/s u/g n ok
|
Final | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | CANC |
Mark Moncarr
|
|
|
Hot tub and service change complete and ready for final Phone #: ###-#### Inspection requested via web by Steve Blackmer Coordinate with homeowner once tub is filled with water, then call back in for final.
|
Permanent Service | 12/31/2019 | 1/2/2020 | 1/2/2020 | P | PASS |
Mark Moncarr
|
|
|
Contact is Greg. ###-####. Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer There is a hot tub under service drop on property. Hot tub is not filled with water nor hooked up. Met and talked with homeowner about 10' horizontal clearence requirements. I mentioned going undergrouind with IDP power, or moving tub. p/s o/h rec ok
|
Issue PAID IN FULL permit | | | 12/31/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/31/2019 | | DONE |
|
|
|
This permit was created on the web by Steve Blackmer
|