Final | 6/15/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Eric Story
|
|
|
Garage Code 2022 Phone #: ###-#### Inspection requested via web by Dean Gernaat Final ok
|
Electrical Rough-In | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Eric Story
|
|
|
Scope of work for BLD has been update/corrected Dean Phone #: ###-#### Detached garage ok to cover
|
Rough-In Permanent Service | 1/30/2020 | 1/30/2020 | 1/30/2020 | A | CANC |
Eric Story
|
|
|
Inspect garage and unfinished room above garage and sub panel in garage Phone #: ###-#### Inspection requested via web by Dean Gernaat Still not included on BLD-Permit techs issued a MIS for out building
|
Rough-In Permanent Service | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Dean Gernaat House only rough in ok cover p/s u/g n ok
|
Electrical Rough-In | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Dean Gernaat Shop not included in description of building permit. 250.32- Seperate buildings or structure fed by feeders or branch circuits shall have a grounding electrode conductor installed. Concrete encased electrode present with no connection to sub-fed panel. No access to upstairs of shop. Feeders to shop not in at time of inspection. Sub-feed in crawl space of house under stairs.
|
Electrical Rough-In | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | PASS |
Eric Story
|
|
|
Under ground conduit inspection Phone #: ###-#### Inspection requested via web by Dean Gernaat U/G for IDPCO ok to cover
|
Issue PAID IN FULL permit | | | 1/2/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/2/2020 | | DONE |
|
|
|
This permit was created on the web by Dean Gernaat
|