Electrical Rough-In | 7/28/2020 | 7/29/2020 | 7/29/2020 | A | PASS |
Tom Saunders
|
|
|
Scott - Inspection can be done outside */Screened*/ Phone #: ###-####....
EQ ring and bonding ok underground ok to cover
|
Electrical Rough-In | 7/20/2020 | 7/21/2020 | 7/21/2020 | P | FAIL |
Tom Saunders
|
|
|
call for access- Scott *screened* *pool* Phone #: ###-####... EQ bond ring 1) required to be 4 to 6 inches below sub grade 2) follow contour of pool and be 18 to 24 inches from inside wall of pool 3) feed to auto cover needs to minimum 18 inches under sub grade from top of pipe
|
Conference | 6/22/2020 | 6/22/2020 | 6/22/2020 | P | PASS |
Tom Saunders
|
|
|
Screened- please call before- SCOTT Phone #: ###-####...discussed EQ ring, attachments, and placement
|
Electrical Rough-In | 6/22/2020 | 6/22/2020 | 6/22/2020 | P | CANC |
Tom Saunders
|
|
|
Screened- please call before- SCOTT Phone #: ###-####...changed to conference
|
Electrical Rough-In | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Tom Saunders
|
|
|
bonding for pool// First thing in AM please// Scott Phone #: ###-####... bonding 4 corners, auto cover, and bond to equipment ok...pouring shell only at this time...LED lighting...EQ bond, underground, and power supply will require future inspections
|
Issue PAID IN FULL permit | | | 1/2/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/2/2020 | | DONE |
|
|
|
This permit was created on the web by Scott Carter
|