Final | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PASS |
Daryl DeGrange
|
|
|
Matt. Phone #: ###-#### Inspection requested via web by Sean DeLacy Job complete, final ok
|
Electrical Rough-In | 4/3/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Rock A. Hudson
|
|
|
Matt. Ceiling cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Confirmed a set of city approved prints on site. Office grid rough in ok cover.
|
Permanent Service | 4/3/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Rock A. Hudson
|
|
|
Matt Phone #: ###-#### Inspection requested via web by Sean DeLacy p/s u/g n ok
|
Permanent Service | 4/1/2020 | 4/2/2020 | 4/2/2020 | A | FAIL |
Rock A. Hudson
|
|
|
Matt. Phone #: ###-#### Inspection requested via web by Sean DeLacy 250.24(A)(1)- Grounding electrode conductors shall terminate a the same terminal or bus as the grounded conductor. 250.50- All grounding electrode discribe in 250.52 1 thru 7 shall be used to create a grounding electrode system. 250.64(C)- Grounding electrode conductors shall be continuous from service termination to grounding electrodes. Grounding electrode conductors to metal underground water pipes shall terminate with in 5' of where pipe enters structure. 250.66- Grounding electrodes to underground metel water pipes shall be #2 copper or 1/0 aluminum minimum.
|
Electrical Rough-In | 1/28/2020 | 1/30/2020 | 1/30/2020 | A | PASS |
Rock A. Hudson
|
|
|
Matt. Wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Full height walls rough in ok cover.
|
Issue PAID IN FULL permit | | | 1/23/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/23/2020 | | DONE |
|
|
|
This permit was created on the web by Sean DeLacy
|
First Notice | 4/8/2020 | 4/8/2020 | | | |
Daryl DeGrange
|
|
|
|