Permanent Service | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by james mair p/s u/g n ok
|
Permanent Service | 7/21/2020 | 7/22/2020 | 7/22/2020 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by james mair 110.24- Availalbe fault current shall be posted prior to permanent service inspection. 250.24- Grounding electrode conductor shall be connected to the grounded conductor at any accessible location on load side of service point. Contactor decided to bond the grounded conductor in CT can and use grounded conductor to bond non-current carrying metal parts of maiin service disconnecting means and panel board as permitted by 250.142(A)(1). Will recall when ready.
|
Rough-In Permanent Service | 7/9/2020 | 7/10/2020 | 7/10/2020 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by james mair Ok cover grd work only between 2 buildings, no service.
|
Issue PAID IN FULL permit | | | 5/18/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 2/19/2020 | | DONE |
|
|
|
This permit was created on the web by james mair
|