Electrical Rough-In | 6/16/2020 | 6/17/2020 | 6/17/2020 | A | PASS |
James Ady
|
|
|
Upstairs is ready, best access is from alley behind house Phone #: ###-#### Inspection requested via web by Troy Cobb Upstairs only ok to cover
|
Electrical Rough-In | 4/30/2020 | 5/1/2020 | 5/1/2020 | P | PASS |
Mark Moncarr
|
|
|
For now we just need approval to cover the lower level of the new building Phone #: ###-#### Inspection requested via web by Troy Cobb Ok cover lower level garage.
|
Telephone call | | | 4/27/2020 | | DONE |
|
|
|
Brandon Shaw called in to change the scope of work on permit because applicant had "wiring for condition space" but it suppose to be "UNcondition space"
|
Change Status to I | | | 4/16/2020 | | DONE |
|
|
|
change status to ISS per Mark Moncarr- this was accidently final because of the Temp service inspection that was done, the Electrician needs to pull a new permit for the Temp Service Pole
|
Temporary Service | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Eric Story
|
|
|
Temp. pole located in back yard, next to new concrete slab Phone #: ###-#### Inspection requested via web by Troy Cobb t/s o/h n ok
|
Electrical Rough-In | 3/18/2020 | 3/19/2020 | 3/19/2020 | P | PASS |
Mark Moncarr
|
|
|
Just need trench inspected for now, approval for backfill. Trench is in back yard, between house and new garage foundation. Please let me know when you are ready to head that way, I can meet you there to ask a couple of questions about the project. Thanks Phone #: ###-#### Inspection requested via web by Troy Cobb Ok cover conduit house to garage.
|
Issue PAID IN FULL permit | | | 3/18/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/18/2020 | | DONE |
|
|
|
This permit was created on the web by Troy Cobb
|