Permanent Service | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Craig As per 445, rough in inspections ok with BLD on hold. No final until BLD is in issued status. p/s o/h n ok
|
Permanent Service | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Craig 110.24 AFC calc required proir to service being energized
|
Electrical Rough-In | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | CANC |
James Ady
|
|
|
Ceiling inspection for recessed cans. Phone #: ###-#### Inspection requested via web by Steve Craig No answer from contractor. No visable resessed cans needing covered. hardlids throughout.
|
Electrical Rough-In | 5/6/2020 | 5/7/2020 | 5/7/2020 | A | PASS |
Rock A. Hudson
|
|
|
Elelctrical rough-in of new construction. Phone #: ###-#### Inspection requested via web by Steve Craig Rough in ok cover
|
Electrical Rough-In | 5/5/2020 | 5/5/2020 | 5/5/2020 | P | FAIL |
Rock A. Hudson
|
|
|
Rough in inspection at new Roosevelt Market Phone #: ###-#### Inspection requested via web by Steve Craig 300.22(B)- MC cable shall not be installed in air handling spaces. 314.20- MC cables shall terminate in a box. 330.30- MC cables shall be secured by approved means with in 12" of a box. City approved set of prints on site
|
Issue PAID IN FULL permit | | | 5/4/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/4/2020 | | DONE |
|
|
|
This permit was created on the web by Steve Craig
|