Final | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | PASS |
Mark Moncarr
|
|
|
Upon arrival I was informed that all equiptment was already installed without a visual RI inspection to verify UL listing. I have mentioned the RI inspection is required multiple, multiple times, by notes and by phone calls. For future inspections, if equiptment is installed the job will be failed, double fee and ALL panels will be removed from the rooftop to the ground.
|
Electrical Rough-In | 5/26/2020 | 5/28/2020 | 5/28/2020 | P | PASS |
Mark Moncarr
|
|
|
Taylor Barton is the onsite contact ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting Panel matched paperwork, all parts UL listed. All equiptment already installed
|
Electrical Rough-In | 5/26/2020 | 5/28/2020 | 5/26/2020 | A | CANC |
Mark Moncarr
|
|
|
Taylor Barton will be the onsite contact: ###-#### Phone #: ###-#### >> Inspection requested via web by BRS Permitting Inspection cancelled from web by: BRS Permitting
|
Issue PAID IN FULL permit | | | 5/15/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/15/2020 | | DONE |
|
|
|
This permit was created on the web by BRS Permitting
|