Electrical Rough-In | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | PASS |
Mark Moncarr
|
|
|
Ceiling cover of can lights and Speaker wire before soffit. Thank you Phone #: ###-#### Inspection requested via web by Steve Blackmer Ok cover porch, can locations are double layer sheetrock
|
Electrical Rough-In | 7/15/2020 | 7/16/2020 | 7/16/2020 | A | PASS |
Mark Moncarr
|
|
|
Covered patio rough in. NMB is stubbed in for can lights, but can lights will not installed until after the fire boxes are built and fire taped. the whole box will be open after drywall for inspection of cans later. Thank you Phone #: ###-#### Inspection requested via web by Steve Blackmer Ok cover back porch. Double layer boxes are in place for recess cans.
|
Issue PAID IN FULL permit | | | 7/14/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/14/2020 | | DONE |
|
|
|
This permit was created on the web by Steve Blackmer
|