Electrical Rough-In | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | CANC |
Mark Moncarr
|
|
|
We would appreciate a 30-minute call ahead. Contact is Ryan Barnes ###-####. This is for an above ceiling rough-in Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|
Permanent Service | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | CANC |
Mark Moncarr
|
|
|
We would appreciate a 30-minute call ahead. Contact is Ryan Barnes ###-#### Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|
Final | 7/21/2020 | 7/22/2020 | 7/22/2020 | P | NR |
Rock A. Hudson
|
|
|
Late PM if possible, please. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Met on site and discussed grounding electrode conductors termination points. Point of service has moved to transfer switch 2500 amp main breaker creating all existing gear to be sub fed from ATS. Normal power to bond grounded conductor at ATS main disconnecting means and emergency power to bond grounded conductor at generator due to grounded conductor being switched at ATS as per 250.30. Performance testing to be done and permanent service to be requested when complete.
|
Issue PAID IN FULL permit | | | 7/21/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/21/2020 | | DONE |
|
|
|
This permit was created on the web by Kerri Hamilton
|