Issue PAID IN FULL permit | | | 10/15/1995 | | I |
|
|
|
|
INSP - Framing/ Rough-in | 7/24/1995 | | 9/5/1995 | | |
|
|
|
|
INSP - Final | 8/29/1995 | 8/30/1995 | 8/30/1995 | A | PASS |
Jack Frank
|
|
|
FINAL/5 MIN
|
INSP - Final | 8/28/1995 | 8/28/1995 | 8/28/1995 | A | FAIL |
Jack Frank
|
|
|
CORRECTIONS/20 MIN
|
INSP - Final | 7/24/1995 | | 7/24/1995 | | |
|
|
|
|
INSP - Permanent service | 7/24/1995 | 7/21/1995 | 7/21/1995 | | PASS |
Pat Lass
|
|
|
6 MIN
|
INSP - Framing/ Rough-in | 7/24/1995 | 7/21/1995 | 7/21/1995 | | PASS |
Pat Lass
|
|
|
25 MIN
|
Application received | | | 7/20/1995 | | |
|
|
|
|