INSP - Final | 9/20/1995 | 9/20/1995 | 9/20/1995 | A | PASS |
Pat Lass
|
|
|
FINAL 0CCUPIED CHECKED WHAT I COULD 25MIN
|
(F) Issue permit | | | 8/8/1995 | | |
|
|
|
|
INSP - Framing/ Rough-in | 8/4/1995 | 8/4/1995 | 8/4/1995 | A | PASS |
Pat Lass
|
|
|
15MIN
|
INSP - Framing/ Rough-in | 8/3/1995 | 8/3/1995 | 8/3/1995 | P | PASS |
Pat Lass
|
|
|
R/I OK/15 MIN
|
INSP - Permanent service | 8/2/1995 | 8/2/1995 | 8/2/1995 | A | PASS |
Pat Lass
|
|
|
12MIN
|
INSP - Framing/ Rough-in | 8/2/1995 | 8/2/1995 | 8/2/1995 | A | FAIL |
Pat Lass
|
|
|
35MIN
|
Application received | | | 8/1/1995 | | |
|
|
|
|