(F) Issue permit | | | 9/27/1995 | | |
|
|
|
|
INSP - Final | 9/18/1995 | 9/18/1995 | 9/18/1995 | A | PASS |
Jack Frank
|
|
|
FINAL/22 MIN
|
INSP - Framing/ Rough-in | 8/11/1995 | 8/11/1995 | 8/11/1995 | P | FAIL |
|
|
|
INSP. ON SURVEY/NOT READY/10MIN
|
INSP - Permanent service | 8/10/1995 | 8/10/1995 | 8/10/1995 | P | PASS |
|
|
|
12MIN
|
INSP - Framing/ Rough-in | 8/10/1995 | 8/10/1995 | 8/10/1995 | P | PASS |
|
|
|
SUR/24MIN
|
Application received | | | 8/10/1995 | | |
|
|
|
|