INSP - Final | 10/6/1995 | 10/6/1995 | 10/6/1995 | A | PASS |
Jack Frank
|
|
|
24min
|
INSP - Permanent service | 9/27/1995 | 9/27/1995 | 9/27/1995 | P | PASS |
Jack Frank
|
|
|
15MIN
|
(F) Issue permit | | | 9/21/1995 | | |
|
|
|
|
INSP - Ground work | 9/20/1995 | 9/20/1995 | 9/20/1995 | P | PASS |
Jack Frank
|
|
|
5 MIN
|
(F) Issue permit | | | 9/11/1995 | | |
|
|
|
|
INSP - Electrical Rough-In | 9/8/1995 | 9/8/1995 | 9/8/1995 | A | PASS |
Jack Frank
|
|
|
26 MIN
|
Application received | | | 9/7/1995 | | |
|
|
|
|