Issue PAID IN FULL permit | | | 7/11/1996 | | |
|
|
|
|
INSP - Permanent service | 5/22/1996 | 5/23/1996 | 5/22/1996 | A | PASS |
Joe Ray
|
|
|
|
INSP - Permanent service | 5/20/1996 | 5/21/1996 | 5/21/1996 | A | N.A. |
Joe Ray
|
|
|
|
Issue FEE-DUE permit | | | 5/17/1996 | | FEE |
|
|
|
|
INSP - Permanent service | 5/15/1996 | 5/16/1996 | 5/16/1996 | A | CANC |
Joe Ray
|
|
|
SENT TO JACK
|
INSP - Permanent service | 5/16/1996 | 5/16/1996 | 5/16/1996 | P | CANC |
Joe Ray
|
|
|
SENT TO JACK
|
INSP - Permanent service | 5/16/1996 | 5/16/1996 | 5/16/1996 | | FAIL |
Jack Frank
|
|
|
/ / 315 - 53 failed cor. & fee due of $25.00 posted NEC,300-3(b),250 n existing GEC from sub panel (old fuse panel)
|
INSP - Ele Rough-In/Perm Svc | 4/24/1996 | 4/24/1996 | 4/24/1996 | P | FAIL |
Jack Frank
|
|
|
04/24/96 315 - PLEASE GO OUT AS SOON AS POSSIBLE THIS WAS SCHEDULED TO G NEVER WAS DONE THANKS 53 failed 09 ok jf cor posted see previous inspection module
|
INSP - Electrical Rough-In | 4/24/1996 | 4/24/1996 | 4/24/1996 | | FAIL |
Jack Frank
|
|
|
/ / 315 - 09&53 failed cor. posted NEC,250-119,250-113(a).370-20,300-3 $25.00 reinspection fee due jf
|
INSP - Ele Rough-In/Perm Svc | 4/22/1996 | 4/22/1996 | 4/24/1996 | P | CANC |
Jack Frank
|
|
|
04/22/96 315 - KEY RIGHT OF BACKDOOR UNDER ROCK REINSPECTION will add to next mod. jf
|
Issue PAID IN FULL permit | | | 4/17/1996 | | |
|
|
|
|
INSP - Ele Rough-In/Perm Svc | 3/28/1996 | 3/28/1996 | 3/28/1996 | P | CANC |
Jack Frank
|
|
|
03/28/96 315 - FOUR ROOMS AND 200 AMP SERVICE AT THE BACK DOOR THERE IS BIG ROCK THERE IS A KEY UNDER THAT ROCK. No 09&53 jf structural told me hold off untill they get the ok on it being changed from house to duplex apartments
|
Issue FEE-DUE permit | | | 3/28/1996 | | FEE |
|
|
|
|
Application received | | | 3/28/1996 | | |
|
|
|
|