INSP - Final | 3/28/1997 | 3/31/1997 | 3/31/1997 | A | FAIL |
Joe Ray
|
|
|
03/29/97 404 - locked no access not ready outside outlet not made up
|
INSP - Final | 3/31/1997 | 3/31/1997 | 3/31/1997 | P | PASS |
Joe Ray
|
|
|
03/31/97 404 - 8147 IS THE LOCK BOX CODE
|
INSP - Final | 3/27/1997 | 3/28/1997 | 3/28/1997 | A | FAIL |
Marv Burrus
|
|
|
03/27/97 403 - COMBO LOCK IS 8147 BCC: RECEPTICLES AND OUTLETS SHALL HAVE ELECTRICAL POWER UPON COMPLETION INSTALLATION OF BRANCH CIRCUITS, FOR FINAL INSPECTION. (NO POWER TO NOR BEDROOM AND HALL)...MB
|
INSP - Final | 12/31/1996 | 1/2/1997 | 1/2/1997 | P | NH |
Joe Ray
|
|
|
01/02/97 404 - no access doors locked
|
Issue PAID IN FULL permit | | | 12/5/1996 | | |
|
|
|
|
INSP - Electrical Rough-In | 12/4/1996 | 12/4/1996 | 12/4/1996 | P | CANC |
|
|
|
SENT FROM TOM...MB
|
INSP - Electrical Rough-In | 12/4/1996 | 12/4/1996 | 12/4/1996 | | PASS |
Marv Burrus
|
|
|
/ / 403 - CORRECTIONS COMPLETED...MB
|
INSP - Ele Rough-In/Perm Svc | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | CANC |
|
|
|
see seperate inspection for 12/02/96
|
INSP - Permanent service | 12/3/1996 | 12/2/1996 | 12/2/1996 | P | PASS |
|
|
|
|
INSP - Electrical Rough-In | 12/3/1996 | 12/2/1996 | 12/2/1996 | P | FAIL |
|
|
|
300-4-D stapling framing members / 305-6 no construction GFCI protection / 370-20 Exterior recep boxes not set out (now flush with chip board)
|
INSP - Ele Rough-In/Perm Svc | 11/27/1996 | 11/27/1996 | 11/27/1996 | P | FAIL |
Joe Ray
|
|
|
no address
|
Application received | | | 11/27/1996 | | |
|
|
|
|
Issue FEE-DUE permit | | | 11/27/1996 | | |
|
|
|
|