Case Summary (ELE) | | | 3/21/2013 | | DONE |
|
|
|
|
FEE REVIEW-NOTES | | | 3/12/1999 | | |
|
|
|
|
Receive PAYMENT IN FULL | | | 7/15/1998 | | |
|
|
|
|
INSP - Final | 7/14/1998 | 7/14/1998 | 7/14/1998 | A | PASS |
Marv Burrus
|
|
|
CONFERENCE FOR REQUIREMENTS FOR CERTIFICATE OF OCCUPANCY.
|
FEE REVIEW-NOTES | | | 7/14/1998 | | |
|
|
|
|
INSP - Final | 6/25/1998 | 6/25/1998 | 6/25/1998 | P | PASS |
Jack Frank
|
|
|
06/25/98 315 - ###-####/ ###-#### cel tower please call before going..tr ok
|
INSP - Final | 6/23/1998 | 6/24/1998 | 6/24/1998 | A | PART |
Jack Frank
|
|
|
06/24/98 315 - DAve ###-####..trans jms.. ok
|
(F) Reprint permit | | | 6/23/1998 | | |
|
|
|
|
(F) Reprint permit | | | 6/15/1998 | | |
|
|
|
|
Change status to Fee Due | | | 6/15/1998 | | FEES |
|
|
|
ADDITIONAL VALUE OF 2195776.00 TOTAL VALUE OF 4,693,776.00 LH
|
INSP - Electrical Rough-In | 4/24/1998 | 4/24/1998 | 4/24/1998 | P | PART |
Marv Burrus
|
|
|
04/24/98 403 - ceiling grid on the 4, 5, and 14, 15 and 16th floor-mike
|
INSP - Electrical Rough-In | 4/14/1998 | 4/14/1998 | 4/14/1998 | P | PART |
Marv Burrus
|
|
|
04/14/98 403 - Scheduled by Hello!. Contact phone is [4242271]. SMOKE DETECTOR INSTALLATION IN UNITS; 1602, 1603, 1604, 1605, 1606, & 16 ALSO, R/I OF ELEVATOR LOBBY'S ON 4TH, 5TH, AND 15TH FLOORS.
|
INSP - Electrical Rough-In | 4/10/1998 | 4/10/1998 | 4/10/1998 | P | PASS |
Marv Burrus
|
|
|
REINSPECTION MAX ###-#### 4TH FLOOR ELEVATOR `A' LOBBY-CEILING.
|
INSP - Final | 3/26/1998 | 3/26/1998 | 3/26/1998 | A | PART |
Marv Burrus
|
|
|
CONFERENCE; DISCUSSED REQUIREMENTS NEEDED BY CONTRACTORS FOR CERTIFICATE OF OCCUPANCY.
|
INSP - Electrical Rough-In | 3/19/1998 | 3/20/1998 | 3/20/1998 | A | PART |
Marv Burrus
|
|
|
03/19/98 403 - Scheduled by Hello!. Contact phone is [4242271]. SUITE 325 (CEILING COVER); SUITES 338 AND 339 (FINAL).
|
INSP - Permanent service | 3/18/1998 | 3/18/1998 | 3/18/1998 | | PASS |
Marv Burrus
|
|
|
/ / 403 - SERVICE DISCONNECT AND METER BANKS FOR FUTURE TENNANTS OF CO
|
INSP - Electrical Rough-In | 3/16/1998 | 3/16/1998 | 3/16/1998 | P | PART |
Marv Burrus
|
|
|
03/16/98 403 - Scheduled by Hello!. Contact phone is [4242271]. 15TH FLOOR; SPEAKERS IN CEILING R/I/.
|
INSP - Electrical Rough-In | 3/10/1998 | 3/10/1998 | 3/11/1998 | P | PART |
Marv Burrus
|
|
|
03/10/98 403 - 3RD FLOOR CEILING AND PARTIAL FINAL ON WALLS--DAVE 424-22
|
INSP - Electrical Rough-In | 3/4/1998 | 3/4/1998 | 3/4/1998 | P | PASS |
Marv Burrus
|
|
|
03/04/98 403 - 3rd floor ceiling walls dave ###-#### MEETING ROOM.
|
INSP - Final | 2/26/1998 | 2/27/1998 | 2/27/1998 | A | PART |
Marv Burrus
|
|
|
02/27/98 403 - PARTIAL 13TH FLOOR--DAVE ###-#### ROOMS AND CORIDOOR.
|
INSP - Electrical Rough-In | 2/18/1998 | 2/19/1998 | 2/19/1998 | A | PART |
Marv Burrus
|
|
|
02/18/98 403 - 14TH FLOOR-2ND FLOOR CEILING-DAVE ###-####
|
INSP - Electrical Rough-In | 2/13/1998 | 2/13/1998 | 2/13/1998 | P | PART |
Jack Frank
|
|
|
02/13/98 315 - PINHOUSE SERVICE P/S 18TH FLOOR..trans by JMS.. still needs to grd xformer and do bonding with 3/0 copper
|
INSP - Final | 2/10/1998 | 2/10/1998 | 2/10/1998 | P | PASS |
Marv Burrus
|
|
|
INQUIRED ABOUT FUTURE INSPECTIONS. CONFERENCE.
|
INSP - Final | 2/2/1998 | 2/3/1998 | 2/3/1998 | A | PART |
Marv Burrus
|
|
|
02/02/98 403 - lobby level partial final.intermediate level part final. second and third floor partial final. dave ###-####
|
INSP - Electrical Rough-In | 1/30/1998 | 2/2/1998 | 2/2/1998 | A | CANC |
Marv Burrus
|
|
|
02/01/98 403 - lobby level interm. lever part. final ###-#### BY CONCTRACTOR, WILL RESCHECDULE.
|
INSP - Ele Rough-In/Perm Svc | 1/29/1998 | 1/30/1998 | 1/30/1998 | A | PASS |
Marv Burrus
|
|
|
01/29/98 403 - dave ###-####. 15TH FLOOR, CORIDOOR ELE R/I.
|
ELE - Partial final | 1/30/1998 | 1/30/1998 | 1/30/1998 | P | PART |
Marv Burrus
|
|
|
EVENT LEVEL.
|
INSP - Electrical Rough-In | 1/22/1998 | 1/23/1998 | 1/23/1998 | A | PASS |
Marv Burrus
|
|
|
01/22/98 403 - dave ###-#### 2ND floor rough wall, MEETING ROOMS.
|
INSP - Electrical Rough-In | 1/22/1998 | 1/22/1998 | 1/22/1998 | P | PASS |
Marv Burrus
|
|
|
01/22/98 403 - late pm ###-#### 14TH FLOOR CORIDOOR WALLS R/I.
|
INSP - Electrical Rough-In | 1/20/1998 | 1/21/1998 | 1/21/1998 | A | PART |
Marv Burrus
|
|
|
01/20/98 403 - 13TH FLOOR EVENT LEVEL CEILING ###-####
|
INSP - Electrical Rough-In | 1/15/1998 | 1/16/1998 | 1/16/1998 | A | PART |
Marv Burrus
|
|
|
01/15/98 403 - 13th floor Dave ###-#### N.E.-SIDE,ENTRY AND BATH CEILINGS.
|
INSP - Conference | 1/15/1998 | 1/15/1998 | 1/15/1998 | P | PASS |
Marv Burrus
|
|
|
DISCUSSED AREAS NEEDED FOR FINALING.
|
INSP - Final | 1/13/1998 | 1/14/1998 | 1/14/1998 | P | PART |
Marv Burrus
|
|
|
01/13/98 403 - ###-####-mABIE
|
INSP - Miscellaneous | 1/13/1998 | 1/13/1998 | 1/13/1998 | | PASS |
Marv Burrus
|
|
|
/ / 403 - DISCUSSED REMAINING INSPECTIONS NECESSARY FOR FINAL OF BANK OF AMERICA CENTER.
|
INSP - Final | 1/9/1998 | 1/12/1998 | 1/12/1998 | A | PART |
Marv Burrus
|
|
|
01/11/98 403 - 12th floor 3rd floor meeting room ceiling and floors 6 th ceilings. ###-#### Dave
|
INSP - Electrical Rough-In | 1/6/1998 | 1/6/1998 | 1/6/1998 | P | PASS |
Marv Burrus
|
|
|
01/06/98 403 - 2nd floor ceiling (LIQUOR ROOM).
|
INSP - Conference | 1/6/1998 | 1/6/1998 | 1/6/1998 | | PASS |
Marv Burrus
|
|
|
/ / 403 - DISCUSSED CLEARANCE ISSUES FOR METERING AND DISCONNECTS OF SUITES.
|
INSP - Final | 1/6/1998 | 1/6/1998 | 1/6/1998 | | PASS |
Marv Burrus
|
|
|
01/06/98 403 - 11th floor rooms.
|
INSP - Final | 12/31/1997 | 1/2/1998 | 1/5/1998 | A | PASS |
Marv Burrus
|
|
|
01/02/98 403 - 10th floor
|
INSP - Temporary occupancy | 12/31/1997 | 12/31/1997 | 12/31/1997 | A | PASS |
Marv Burrus
|
|
|
TEMP/OCCUP. FOR FIRST 9 FLOORS OF T.C.O.
|
INSP - Temporary occupancy | 12/31/1997 | 12/31/1997 | 12/31/1997 | A | PASS |
Marv Burrus
|
|
|
TEMP/OCCUP. FOR FIRST 9 FLOORS OF T.C.O.
|
INSP - Miscellaneous | 12/30/1997 | 12/30/1997 | 12/30/1997 | P | FAIL |
Marv Burrus
|
|
|
TESTED POWER SUPPLY TO KITCHEN HOOD FAN/OPERATION. ALARM CONTROL SHALL BE REPROGRAMED.
|
ELE - Partial final | 12/29/1997 | 12/29/1997 | 12/29/1997 | P | PART |
Marv Burrus
|
|
|
12/29/97 403 - LOBBY--8TH AND 9TH FLOOR--HOOD EXHAUST
|
ELE - Partial final | 12/23/1997 | 12/24/1997 | 12/24/1997 | A | PART |
Marv Burrus
|
|
|
12/23/97 403 - ROOMS 6 & 7--LOBBY AND BALLROOM
|
INSP - Electrical Rough-In | 12/23/1997 | 12/24/1997 | 12/24/1997 | A | PART |
Marv Burrus
|
|
|
12/23/97 403 - LOBBY LEVEL CEILING
|
INSP - Electrical Rough-In | 12/23/1997 | 12/23/1997 | 12/23/1997 | P | PART |
Marv Burrus
|
|
|
12/23/97 403 - STAIRWELL ONE, 4 LEVELS.
|
INSP - Electrical Rough-In | 12/22/1997 | 12/22/1997 | 12/22/1997 | P | PASS |
Marv Burrus
|
|
|
12/22/97 403 - ball room, EVENT LEVEL ALARM AND STROBE SIGNAL TESTING.
|
INSP - Conference | 12/22/1997 | 12/22/1997 | 12/22/1997 | A | PASS |
Marv Burrus
|
|
|
discussed requirements for code violations for job final.
|
INSP - Electrical Rough-In | 12/18/1997 | 12/19/1997 | 12/19/1997 | A | PASS |
Marv Burrus
|
|
|
12/18/97 403 - 2ND FLOOR CEILING/KITCHEN/2ND FLOOR PANELS
|
INSP - Conference | 12/19/1997 | 12/19/1997 | 12/19/1997 | | PASS |
Marv Burrus
|
|
|
/ / 403 - PROFIT MEETING.
|
INSP - Electrical Rough-In | 12/17/1997 | 12/18/1997 | 12/18/1997 | A | PASS |
Marv Burrus
|
|
|
12/17/97 403 - LOBBY CEILING (VALET PARKING CENTER). DISCONNECTS IN LOBBY NEAR RAMP. WALK-IN COOLERS(TOP).
|
INSP - Electrical Rough-In | 12/16/1997 | 12/16/1997 | 12/16/1997 | P | PART |
Marv Burrus
|
|
|
12/16/97 403 - 13TH FLOOR, LOBBY AREA(CEILING AREA), VALET BOOTH.
|
INSP - Electrical Rough-In | 12/15/1997 | 12/15/1997 | 12/15/1997 | P | PART |
Marv Burrus
|
|
|
12/15/97 403 - 13TH FLOOR, NORTH SIDE ROOMS.
|
INSP - Electrical Rough-In | 12/15/1997 | 12/15/1997 | 12/15/1997 | P | CANC |
Marv Burrus
|
|
|
12/15/97 403 - PORTA COCHERE--PLACE WHERE THE CAR DRIVES UP BY CONTRACTOR, WILL RESCHEDULE.
|
INSP - Electrical Rough-In | 12/10/1997 | 12/10/1997 | 12/10/1997 | P | PART |
Marv Burrus
|
|
|
12/10/97 403 - LOBBY; HEAT TAPE INSTALLATION.
|
INSP - Electrical Rough-In | 12/9/1997 | 12/9/1997 | 12/9/1997 | P | PART |
Marv Burrus
|
|
|
LOBBY/ HI MARV! WALL R/I NEAR BACK-DOCK.
|
INSP - Ele Rough-In/Perm Svc | 12/3/1997 | 12/4/1997 | 12/4/1997 | A | PART |
Marv Burrus
|
|
|
12/03/97 403 - Scheduled by Hello! on 12/03/97 at 16:35:09. CEILING-GRAND STAIRWAY. NO PERM/SVC REQUESTED.
|
INSP - Conference | 12/3/1997 | 12/3/1997 | 12/3/1997 | | PASS |
Marv Burrus
|
|
|
/ / 403 - CHECKED ON CLEARANCES OF SERVIEC PANELS ON DIFFERENT FLOOR L
|
INSP - Conference | 12/2/1997 | 12/2/1997 | 12/2/1997 | | PASS |
Marv Burrus
|
|
|
/ / 403 - "PROFIT" MEETING WITH BOISE CITY INSPECTORS, PCL CONSTRUCTIO INVESTORS TO DISCUSS REQUIREMENTS FOR FINAL C.0.
|
INSP - Electrical Rough-In | 12/1/1997 | 12/2/1997 | 12/2/1997 | A | PART |
Marv Burrus
|
|
|
12/01/97 403 - LOBBY LEVEL FALSE COLUMN ELE R/I.
|
INSP - Ele Rough-In/Perm Svc | 11/25/1997 | 11/26/1997 | 11/26/1997 | P | PASS |
Marv Burrus
|
|
|
11/26/97 403 - Scheduled by Hello! on 11/25/97 at 12:56:44. BALLROOM: CEILING COVER. 11TH FLOOR: CEILING COVER. LOBBY LEVEL: ELEVA WALLS.
|
INSP - Ele Rough-In/Perm Svc | 11/20/1997 | 11/21/1997 | 11/21/1997 | P | PART |
Jack Frank
|
|
|
11/21/97 315 - Scheduled by Hello! on 11/20/97 at 16:15:12...I gave this tried to cancel, but couldn't... 09 ok jf
|
INSP - Electrical Rough-In | 11/18/1997 | 11/18/1997 | 11/18/1997 | P | PART |
Marv Burrus
|
|
|
11/18/97 403 - 12TH FLOOR.
|
INSP - Electrical Rough-In | 11/14/1997 | 11/17/1997 | 11/17/1997 | P | PART |
Marv Burrus
|
|
|
11/17/97 403 - LOBBY AND, 9TH FLOOR CEILING.
|
INSP - Electrical Rough-In | 11/14/1997 | 11/14/1997 | 11/14/1997 | P | NR |
Marv Burrus
|
|
|
11/14/97 403 - 9TH FLOOR. NOT READY, WILL RESCHEDULE. CEILING.
|
INSP - Electrical Rough-In | 11/10/1997 | 11/7/1997 | 11/7/1997 | P | PASS |
Jack Frank
|
|
|
r/i on 6, 7, 8 & 11 floors...sent to 315 by 324 @ 3:30 pm...JMS
|
INSP - Electrical Rough-In | 11/3/1997 | 11/4/1997 | 11/4/1997 | A | PASS |
Marv Burrus
|
|
|
11/03/97 403 - LATE AM/ 10TH FLOOR. CORIDOOR AND UNIT WALLS R/I, NOT BA HI MARV!
|
INSP - Electrical Rough-In | 10/30/1997 | 10/31/1997 | 10/31/1997 | A | PART |
Marv Burrus
|
|
|
10/30/97 403 - 9TH FLOOR, 7TH FLOOR, AND EVENT LEVEL, CALL ###-#### MABI
|
INSP - Electrical Rough-In | 10/29/1997 | 10/30/1997 | 10/30/1997 | A | CANC |
Marv Burrus
|
|
|
10/29/97 403 - 9TH FLOOR WILL RESCHEDULE.
|
INSP - Electrical Rough-In | 10/27/1997 | 10/27/1997 | 10/27/1997 | P | PART |
Marv Burrus
|
|
|
10/27/97 403 - 8TH FLOOR AND 6TH FLOOR CEILINGS
|
INSP - Electrical Rough-In | 10/22/1997 | 10/23/1997 | 10/23/1997 | P | PART |
Marv Burrus
|
|
|
10/23/97 403 - 8TH FLOOR--STARIWELL--LATE PM PLEASE--
|
INSP - Permanent service | 10/22/1997 | 10/23/1997 | 10/23/1997 | P | CANC |
Marv Burrus
|
|
|
10/23/97 403 - INSPECTED ON 10-22-97.
|
INSP - Permanent service | 10/22/1997 | 10/22/1997 | 10/22/1997 | A | PASS |
Marv Burrus
|
|
|
INSPECTED PANELBOARDS ON #1OTH, 11TH, 12TH, AND 13TH FLOORS.
|
INSP - Electrical Rough-In | 10/20/1997 | 10/21/1997 | 10/20/1997 | A | PART |
Marv Burrus
|
|
|
SASCO, SHELL & CORE/ BLD96-0710 7TH FLOOR CORIDOOR; & LOBBY LEVEL KITCHEN R/I.
|
INSP - Electrical Rough-In | 10/16/1997 | 10/16/1997 | 10/16/1997 | P | PART |
Marv Burrus
|
|
|
10/16/97 403 - 7TH FLOOR NORTHSIDE, WALLS ONLY.
|
INSP - Electrical Rough-In | 10/15/1997 | 10/15/1997 | 10/15/1997 | P | PASS |
Marv Burrus
|
|
|
10/15/97 403 - marv. this one was missed on 10-9-97 im not sure what hap 7TH FLOOR WEST WALLS R/I.
|
INSP - Permanent service | 10/7/1997 | 10/8/1997 | 10/8/1997 | A | PASS |
Marv Burrus
|
|
|
PANEL BOARDS FOR THE 3RD AND 6TH FLOOR
|
INSP - Electrical Rough-In | 10/8/1997 | 10/8/1997 | 10/8/1997 | P | PASS |
Marv Burrus
|
|
|
10/08/97 403 - IF POSSIBLE 1:00 3RD FLOOR EXHIBITION AREA.
|
INSP - Electrical Rough-In | 10/7/1997 | 10/7/1997 | 10/7/1997 | A | PASS |
Marv Burrus
|
|
|
2ND FLOOR
|
INSP - Electrical Rough-In | 10/1/1997 | 10/2/1997 | 10/2/1997 | P | PART |
Marv Burrus
|
|
|
10/02/97 403 - 6TH-PLUS THE CANOPY LIGHTS
|
INSP - Electrical Rough-In | 10/1/1997 | 10/1/1997 | 10/1/1997 | | PART |
Marv Burrus
|
|
|
/ / 403 - 6TH FLOOR & CANOPY LIGHTS.
|
INSP - Miscellaneous | 9/30/1997 | 9/30/1997 | 9/30/1997 | | PASS |
Marv Burrus
|
|
|
/ / 403 - GENERATOR FULL-LOAD TEST.
|
INSP - Electrical Rough-In | 9/25/1997 | 9/26/1997 | 9/26/1997 | P | FAIL |
Marv Burrus
|
|
|
09/26/97 403 - GEN TEST AT 1 P.M. GENERATOR HAD PHASE TO GROUND (DIRECT SHORT), AT TEST.
|
INSP - Electrical Rough-In | 9/24/1997 | 9/24/1997 | 9/24/1997 | P | PART |
Marv Burrus
|
|
|
2ND FLOOR: PRE-FUNCTION AREA,ROOM# 215, COLUME. 3RD FLOOR: ROOM# 315.
|
INSP - Electrical Rough-In | 9/21/1997 | 9/19/1997 | 9/22/1997 | | PART |
Marv Burrus
|
|
|
/ / 403 - TRANSFORMER AND PANEL (EVENT LEVEL).
|
INSP - Temporary occupancy | 9/18/1997 | 9/18/1997 | 9/18/1997 | P | PASS |
Marv Burrus
|
|
|
TEMP/OCC INSPECTION FOR SCHEDULED CONCERT.
|
INSP - Temporary occupancy | 9/18/1997 | 9/18/1997 | 9/18/1997 | P | PASS |
Marv Burrus
|
|
|
TEMP/OCC INSPECTION FOR SCHEDULED CONCERT.
|
INSP - Electrical Rough-In | 9/17/1997 | 9/17/1997 | 9/17/1997 | | PART |
Marv Burrus
|
|
|
/ / 403 - LOBBY BATHROOMS, TRANSFORMERS 3RD FLOOR.
|
INSP - Electrical Rough-In | 9/15/1997 | 9/15/1997 | 9/15/1997 | P | PASS |
Marv Burrus
|
|
|
09/15/97 403 - 2nd floor-event level ceilings,3RD FLOOR-BATHROOMS CEILIN
|
INSP - Conference | 9/15/1997 | 9/15/1997 | 9/15/1997 | A | PASS |
Marv Burrus
|
|
|
DISCUSSED NECESSARY COMPLETIONS FOR TEMP/OCCUP FOR UPCOMING EVENT. ALSO, AREAS TO CORRECT CLEARANCE VIOLATIONS.
|
INSP - Temporary occupancy | 9/10/1997 | 9/10/1997 | 9/10/1997 | P | PASS |
Marv Burrus
|
|
|
ONLY AREA FOR SCHEDULED EVENT.
|
INSP - Temporary occupancy | 9/10/1997 | 9/10/1997 | 9/10/1997 | P | PASS |
Marv Burrus
|
|
|
ONLY AREA FOR SCHEDULED EVENT.
|
INSP - Conference | 9/9/1997 | 9/9/1997 | 9/9/1997 | A | PASS |
Marv Burrus
|
|
|
DISCUSSED CLEARANCES OF SERVICE PANELS.
|
INSP - Electrical Rough-In | 9/8/1997 | 9/8/1997 | 9/8/1997 | P | PASS |
Marv Burrus
|
|
|
3RD FLOOR , MECH. EQUIP PANEL BOARDS,
|
INSP - Electrical Rough-In | 9/5/1997 | 9/8/1997 | 9/5/1997 | P | PASS |
Marv Burrus
|
|
|
PENTHOUSE, MCC, CHILLERS, COOLING TOWERM, WATER HEATER AND PANELS
|
INSP - Electrical Rough-In | 9/5/1997 | 9/8/1997 | 9/5/1997 | P | PASS |
Marv Burrus
|
|
|
2ND FLOOR , PANELS, BALL ROOM WALL ROUGH-IN, MEN AND WOMENS BATHROOM CEILING, AND CORRIDOR,
|
INSP - Conference | 9/4/1997 | 9/5/1997 | 9/5/1997 | P | PASS |
Marv Burrus
|
|
|
AT 2:30 AS PER JIM SCHMER discussed needed code requirements for opening.
|
INSP - Conference | 9/4/1997 | 9/5/1997 | 9/5/1997 | P | PASS |
Jim Schmer
|
|
|
2:30 PM
|
INSP - Conference | 9/4/1997 | 9/4/1997 | 9/4/1997 | A | PASS |
Jim Schmer
|
|
|
|
INSP - Hot Tubs/Spas | 8/28/1997 | 8/29/1997 | 8/29/1997 | A | PART |
Marv Burrus
|
|
|
08/28/97 403 - 5TH FLOOR JACZ/POOL BONDING; 3RD FLOOR ELEVATOR SHAFT WAL
|
INSP - Conference | 8/28/1997 | 8/28/1997 | 8/28/1997 | A | PASS |
Marv Burrus
|
|
|
DISCUSSED CODE VIOLATIONS OF CLEARANCES ABOUT SERVICE DISCONNECTS.
|
INSP - Electrical Rough-In | 8/27/1997 | 8/28/1997 | 8/28/1997 | A | PART |
Marv Burrus
|
|
|
08/27/97 403 - EVENT LEVEL. ELE-R/I FOR 5 BATHROOM LITES.
|
INSP - Electrical Rough-In | 8/25/1997 | 8/26/1997 | 8/26/1997 | A | PART |
Marv Burrus
|
|
|
can. lights, 2nd and 3rd fl part. r/i switch gear, stair case
|
INSP - Electrical Rough-In | 8/21/1997 | 8/22/1997 | 8/22/1997 | P | PASS |
Marv Burrus
|
|
|
08/22/97 403 - 2nd floor r/partial walls partial panel different level
|
INSP - Conference | 8/22/1997 | 8/21/1997 | 8/21/1997 | A | PASS |
Marv Burrus
|
|
|
MEETING WITH INSPECTIORS AND ENGINEERS OF WEST COAST HOTEL.
|
INSP - Electrical Rough-In | 8/18/1997 | 8/18/1997 | 8/18/1997 | | PART |
Marv Burrus
|
|
|
08/18/97 403 - 3RD FLOOR. BATHROOM WALLS, ROOMS# 305&306; ELEVATOR "E"
|
INSP - Electrical Rough-In | 8/13/1997 | 8/14/1997 | 8/14/1997 | P | PART |
Marv Burrus
|
|
|
08/14/97 403 - stairwell#2, 2nd floor, event level, and the intermediate
|
INSP - Electrical Rough-In | 8/8/1997 | 8/11/1997 | 8/11/1997 | A | PART |
Marv Burrus
|
|
|
08/10/97 403 - pool penthouse and intermediate wall lobby r/i LOBBY AREA NOT READY, WILL RESCHEDULE.
|
INSP - Electrical Rough-In | 8/7/1997 | 8/8/1997 | 8/10/1997 | P | PART |
Marv Burrus
|
|
|
08/07/97 403 - PARTIAL ROUGH-IN 2ND FLOOR 3RD FLOOR AND LOBBY LEVEL. LOBBY NOT READY AT THIS TIME...MB
|
INSP - Permanent service | 8/5/1997 | 8/6/1997 | 8/6/1997 | P | PASS |
Marv Burrus
|
|
|
08/06/97 403 - MAIN SWITCH-GEAR PERM/SVC INSPECTION.
|
INSP - Electrical Rough-In | 8/4/1997 | 8/5/1997 | 8/5/1997 | A | PASS |
Marv Burrus
|
|
|
08/04/97 403 - rough-in on the walls. 3RD FLOOR FLOOR INTERMEDIATE LEVEL LID CEILING IN ROOMS EXCEPT ROOMS # 221, 215, 206, 207, 225, 226, 227, &
|
INSP - Permanent service | 7/31/1997 | 8/4/1997 | 8/4/1997 | A | CANC |
Marv Burrus
|
|
|
08/03/97 403 - REQUEST BY CONTRACTOR...
|
INSP - Electrical Rough-In | 7/31/1997 | 8/1/1997 | 8/1/1997 | P | PART |
Marv Burrus
|
|
|
08/01/97 403 - PARTIAL WALL INSPECTION. CORRIDOOR INNERWALL 2ND FLOOR; CORRIDOOR SMALL INNER WALL 3RD FLOOR.
|
INSP - Permanent service | 7/30/1997 | 7/31/1997 | 7/31/1997 | A | CANC |
Marv Burrus
|
|
|
07/30/97 403 - WILL RESCHEDULE AT LATER DATE.
|
INSP - Conference | 7/31/1997 | 7/31/1997 | 7/31/1997 | | PASS |
Marv Burrus
|
|
|
/ / 403 - DISCUSSED FIRE WALL VIOO DISCUSSED FIRE WALL VIOLATIONS, AND ELECTRICAL MATERIAL INSTALLED WITHOU INSPECTIONS.
|
INSP - Conference | 7/31/1997 | 7/31/1997 | 7/31/1997 | A | PASS |
Jim Schmer
|
|
|
All supervisors and inspectors, cover problems on inspections.
|
INSP - Conference | 7/30/1997 | 7/30/1997 | 7/30/1997 | P | PASS |
Jack Frank
|
|
|
01 ok jf was with MBurrus 01 on 53 in basement
|
INSP - Conference | 7/30/1997 | 7/30/1997 | 7/30/1997 | | PASS |
Marv Burrus
|
|
|
/ / 403 - DISCUSSED CODE REQUIREMENTS FOR MAIN SERVICE SWITCH GEAR.
|
INSP - Electrical Rough-In | 7/24/1997 | 7/25/1997 | 7/25/1997 | A | PASS |
Marv Burrus
|
|
|
07/24/97 403 - LOBBY AREA, OUTER WALL...MB
|
INSP - Electrical Rough-In | 7/17/1997 | 7/18/1997 | 7/18/1997 | A | PASS |
Marv Burrus
|
|
|
07/17/97 403 - 3rd floor. SOUTHEAST INTERIOR WALLS...MB
|
INSP - Electrical Rough-In | 7/15/1997 | 7/16/1997 | 7/16/1997 | A | PART |
Marv Burrus
|
|
|
07/15/97 403 - r/i on the event level. 4 SMALL WALLS ONLY...MB
|
INSP - Electrical Rough-In | 7/2/1997 | 7/2/1997 | 7/2/1997 | P | PASS |
Joe Ray
|
|
|
07/02/97 404 - need at 2 o'clock if not could you do it thur.a.m. 2nd fl
|
INSP - Electrical Rough-In | 6/11/1997 | 6/12/1997 | 6/12/1997 | A | PART |
Marv Burrus
|
|
|
3 RD FLOOR, INNER WALLS. 2ND FLOOR, INNER WALLS...MB
|
INSP - Electrical Rough-In | 5/27/1997 | 5/28/1997 | 5/28/1997 | A | PART |
Jack Frank
|
|
|
05/28/97 315 - 2ND FLOOR 09 ok jf partial walls
|
INSP - Electrical Rough-In | 5/2/1997 | 5/5/1997 | 5/5/1997 | A | PART |
Marv Burrus
|
|
|
05/04/97 403 - FIRE ALARM & EXIT LIGHTS IN LOBBY AREA; RECEPTICLES IN EV
|
INSP - Electrical Rough-In | 4/21/1997 | 4/21/1997 | 4/22/1997 | P | PART |
Marv Burrus
|
|
|
04/21/97 403 - wall cover EVENT LEVEL CENTER WALLS, R/I...MB
|
Issue PAID IN FULL permit | | | 4/10/1997 | | |
|
|
|
|
INSP - Electrical Rough-In | 4/3/1997 | 4/4/1997 | 4/4/1997 | A | PART |
Marv Burrus
|
|
|
wall rough-in EVENT SECTION HALL CORRIDOR; FIRST FLOOR EXIT CIRCUITS.
|
(F) Reprint permit | | | 2/24/1997 | | |
|
|
|
|
Application received | | | 2/13/1997 | | |
|
|
|
|
Issue FEE-DUE permit | | | 2/13/1997 | | |
|
|
|
|