INSP - Final | 8/28/1997 | 8/28/1997 | 8/29/1997 | P | PASS |
Jack Frank
|
|
|
08/28/97 315 - REINSPECTION AFTER 2:00 14 ok jf sur posted need to insta
|
INSP - Final | 8/21/1997 | 8/21/1997 | 8/21/1997 | P | CANC |
Jack Frank
|
|
|
Scheduled by Hello! on 08/21/97 at 11:32:39. after lunch Temp Occupancy
|
INSP - Final | 8/21/1997 | 8/21/1997 | 8/21/1997 | | FAIL |
Jack Frank
|
|
|
08/21/97 315 - Scheduled by Hello! on 08/21/97 at 11:32:39. after lunch 25 failed jf cor. posted 250-23(b) & 51
|
INSP - Electrical Rough-In | 7/9/1997 | 7/9/1997 | 7/9/1997 | P | PART |
Jack Frank
|
|
|
07/09/97 315 - grounding and ceiling cover 09 ok jf
|
INSP - Electrical Rough-In | 7/1/1997 | 7/1/1997 | 7/1/1997 | P | PASS |
Jack Frank
|
|
|
07/01/97 315 - 09 ok jf
|
INSP - Ground work | 5/5/1997 | 5/5/1997 | 5/5/1997 | P | NR |
Jack Frank
|
|
|
05/05/97 315 - CONCRETE SLAB R/I LATE PM NR JF Warren said should be re 5/6/97
|
Receive PAYMENT IN FULL | | | 4/18/1997 | | |
|
|
|
|
Issue & PRINT FEE-DUE permit | | | 4/16/1997 | | |
|
|
|
|
Application received | | | 4/16/1997 | | |
|
|
|
|