ELE - Partial final | 12/22/1997 | 12/23/1997 | 12/23/1997 | A | PASS |
Marv Burrus
|
|
|
EAST WING 2ND FLOOR..trans by JMS.. NO OCCUPANCY CARD ON JOB-SITE FOR SIGNING, WILL SIGN WHEN LOCATED.
|
INSP - Final | 8/26/1997 | 8/27/1997 | 8/27/1997 | P | PASS |
Marv Burrus
|
|
|
08/27/97 403 - I brought this from yestereday, Jim S. THREE OFFICES ARE UNDER TEMP/OCC PENDING RESULTS OF FIRE DEPT. DECISSION CONCERNING SPRINKLER SYSTEM.
|
INSP - Final | 8/20/1997 | 8/20/1997 | 8/21/1997 | P | PASS |
Marv Burrus
|
|
|
part. final rooms a and b
|
INSP - Electrical Rough-In | 8/12/1997 | 8/13/1997 | 8/13/1997 | A | PASS |
Marv Burrus
|
|
|
08/12/97 403 - ceiling grid inspection on rooms A,B,C and D.
|
INSP - Electrical Rough-In | 8/6/1997 | 8/6/1997 | 8/6/1997 | P | PASS |
Marv Burrus
|
|
|
08/06/97 403 - ceiling cover ROOMS F, G, & H...MB
|
INSP - Electrical Rough-In | 7/21/1997 | 7/22/1997 | 7/22/1997 | A | PART |
Marv Burrus
|
|
|
07/21/97 403 - ROOM A
|
INSP - Electrical Rough-In | 7/16/1997 | 7/18/1997 | 7/17/1997 | A | PASS |
Marv Burrus
|
|
|
walls a,b,c
|
INSP - Electrical Rough-In | 7/16/1997 | 7/17/1997 | 7/17/1997 | A | PASS |
Marv Burrus
|
|
|
07/17/97 403 - walls r/i
|
INSP - Electrical Rough-In | 7/15/1997 | 7/16/1997 | 7/16/1997 | P | PASS |
Marv Burrus
|
|
|
07/15/97 403 - room E. INTERIOR WALLS.
|
Receive PAYMENT IN FULL | | | 7/16/1997 | | |
|
|
|
|
INSP - Electrical Rough-In | 7/11/1997 | 7/14/1997 | 7/14/1997 | P | PART |
Marv Burrus
|
|
|
07/14/97 403 - 2ND FLOOR T.I. WALLS LETTERED F G AND H
|
INSP - Electrical Rough-In | 7/7/1997 | 7/8/1997 | 7/8/1997 | A | PART |
Jack Frank
|
|
|
07/08/97 315 - finished up the demising walls 09 ok jf
|
INSP - Electrical Rough-In | 7/7/1997 | 7/7/1997 | 7/7/1997 | P | PART |
Jack Frank
|
|
|
07/07/97 315 - MK demising walls 09 ok jf
|
INSP - Electrical Rough-In | 7/1/1997 | 7/2/1997 | 7/2/1997 | A | PART |
Jack Frank
|
|
|
07/01/97 315 - corridor ceilings 09 part ok jf
|
INSP - Electrical Rough-In | 6/25/1997 | 6/25/1997 | 6/26/1997 | A | PART |
Jack Frank
|
|
|
on wall 2nd floor partial 09 ok jf hallway
|
INSP - Electrical Rough-In | 6/16/1997 | 6/16/1997 | 6/17/1997 | P | PART |
Marv Burrus
|
|
|
06/16/97 403 - rough-in fire wall 2nd floor and a new wall from 1st floo
|
INSP - Electrical Rough-In | 6/12/1997 | 6/13/1997 | 6/13/1997 | A | PART |
Marv Burrus
|
|
|
06/12/97 403 - SOUTHEAST INNER WALLS ONLY...MB
|
INSP - Electrical Rough-In | 6/12/1997 | 6/12/1997 | 6/12/1997 | P | CANC |
Jack Frank
|
|
|
Rough-in for the walls. CONTRACTOR CALLED AND CANCELED INSPECTION CHANGED TO 6/13/97
|
Issue & PRINT FEE-DUE permit | | | 6/11/1997 | | |
|
|
|
|
Application received | | | 6/11/1997 | | |
|
|
|
|