DOC - Permit Finaled | 5/14/2001 | 5/14/2001 | 5/14/2001 | A | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 5/14/2001 10:55:06 AM
|
Receive PAYMENT IN FULL | | | 4/10/2000 | | DONE |
|
|
|
|
FEE REVIEW-NOTES | | | 3/16/2000 | | DONE |
|
|
|
final from ec
|
(F) Reprint permit | | | 3/16/2000 | | DONE |
|
|
|
|
FEE REVIEW-NOTES | | | 3/15/2000 | | |
|
|
|
|
Final | 12/6/1999 | 12/7/1999 | 12/7/1999 | A | PASS |
Jim Schmer
|
|
|
###-####
|
Final | 11/24/1999 | 11/24/1999 | 11/24/1999 | P | PART |
Jim Schmer
|
|
|
susan 1-4 final ###-#### ( t/o only)- labels for panels, wedges for conductors in conduit between floors)
|
Final | 11/19/1999 | 11/22/1999 | 11/22/1999 | A | PART |
Pat Lass
|
|
|
WES ###-#### FN 5th floor ok.
|
Final | 11/17/1999 | 11/18/1999 | 11/18/1999 | A | FAIL |
Pat Lass
|
|
|
FOR PENTHOUSE-- FN WES ###-#### bonding of water systems in penthouse.
|
Final | 11/10/1999 | 11/12/1999 | 11/12/1999 | A | FAIL |
Pat Lass
|
|
|
FLOOR 2 THROUGH 5 FN EVERYTHING ---WES ###-#### BSU ENGINEERING-BUILDING Wiremolds LB's bonding.
|
Electrical Rough-In | 10/13/1999 | 10/18/1999 | 10/18/1999 | A | NR |
Pat Lass
|
|
|
ceiling r/i wes ###-#### Not ready
|
Electrical Rough-In | 10/18/1999 | 10/18/1999 | 10/18/1999 | P | PASS |
Pat Lass
|
|
|
wes--- ###-#### r/i-- R/I ok first floor ceiling
|
Final | 10/5/1999 | 10/6/1999 | 10/6/1999 | P | PASS |
Pat Lass
|
|
|
4th floor switch gear ###-#### 4th floor ceiling and service ok
|
Final | 9/29/1999 | 10/4/1999 | 10/4/1999 | A | FAIL |
Pat Lass
|
|
|
OFFICE ####-#### -FN-SWITCH GEAR Grounding
|
Final | 9/29/1999 | 10/4/1999 | 10/4/1999 | A | FAIL |
Pat Lass
|
|
|
OFFICE-- ###-#### --4TH FLOOR-- CEILING INSP FN-BSU supports grounding pigtails box fill
|
Electrical Rough-In | 9/27/1999 | 9/27/1999 | 9/27/1999 | P | PART |
Marv Burrus
|
|
|
SKIP-- ###-####-CEILING INSP (JMS) Ceiling ELE R/I; 2nd & 3rd floors
|
Electrical Rough-In | 9/7/1999 | 9/10/1999 | 9/10/1999 | A | PART |
Jack Frank
|
|
|
partial r/I ok
|
INSP - Electrical Rough-In | 7/6/1999 | 7/7/1999 | 7/7/1999 | A | PART |
Marv Burrus
|
|
|
07/06/99 403 - 1ST AND 5TH FLOOR ###-#### ..trans jms.. WALLS ELE R/I.
|
INSP - Electrical Rough-In | 6/15/1999 | 6/15/1999 | 6/15/1999 | | PART |
Marv Burrus
|
|
|
06/14/99 403 - 4th floor Becky ###-#### WALLS, ELE R/I.
|
INSP - Electrical Rough-In | 5/20/1999 | 5/20/1999 | 5/20/1999 | | PART |
Joe Ray
|
|
|
05/20/99 404 - ###-####//BSU ENGINEERING FLR 1 & 2
|
Receive PAYMENT IN FULL | | | 11/13/1998 | | |
|
|
|
|
INSP - Electrical Rough-In | 9/21/1998 | 9/21/1998 | 9/21/1998 | P | PART |
Jack Frank
|
|
|
09/21/98 315 - Scheduled by Hello!. Contact phone is [8883124]. u/g ok
|
INSP - Electrical Rough-In | 9/11/1998 | 9/11/1998 | 9/11/1998 | P | PART |
Jack Frank
|
|
|
09/11/98 315 - Scheduled by Hello!. Contact phone is [8883124]. communication trench ok
|
Application received | | | 9/10/1998 | | |
|
|
|
|
Issue & PRINT FEE-DUE permit | | | 9/10/1998 | | |
|
|
|
|