DOC - Permit Finaled | 12/5/2000 | 12/5/2000 | 12/5/2000 | A | PASS |
Joe Ray
|
|
|
Added by Inspector: 404 On 12/5/2000 9:57:33 AM
|
Final | 12/21/1999 | 12/21/1999 | 12/21/1999 | P | PASS |
Joe Ray
|
|
|
###-####
|
Receive PAYMENT IN FULL | | | 12/7/1999 | | DONE |
|
|
|
|
Electrical Rough-In | 11/15/1999 | 11/16/1999 | 11/16/1999 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/15/1999 at 16:54:12. Contact: ###-####. (JMS) Correction posted called 300-4 nail plates & 1 1/4 from edge of stud to edge of cable 310-5 needs #18 ANG low voltage wiring.
|
Electrical Rough-In | 11/16/1999 | 11/16/1999 | 11/16/1999 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/16/1999 at 10:15:25. Contact: ###-####.
|
Application received | | | 11/12/1999 | | |
|
|
|
|
Issue & PRINT FEE-DUE permit | | | 11/12/1999 | | DONE |
|
|
|
|